BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Charlestown Township, Pennsylvania. Design plans call for site work for a road / highway; and for paving for a road / highway.

As of September 14, 2022, a design engineer has been selected. *The previous solicitation is listed below for reference Requests for clarification are due Monday, April 4, 2022 4:00:00 PM [(UTC-05:00) Eastern Time (US & Canada)]. East Whiteland Township is located in Chester County, PA approximately 25 miles from Philadelphia and proximate to King of Prussia and the Main Line. The Township is largely a developed suburban community and a regional employment center. Infill development and redevelopment is beginning to take place. The Township enjoys a strong road network for vehicular traffic (PA Turnpike, Route 202, Route 29, and Route 30/Lancaster Avenue). Two rail lines (one freight and one passenger) traverse the Township, but there are no train stations. The Chester Valley Trail also crosses the mid-section of the Township in an east-west direction with a handful of direct connections to residential neighborhoods, parks, and other destinations. Pedestrian and bicycle circulation is difficult in most of the Township and improving it is a goal of the community. More specifically, the Township desires to design, engineer, and ultimately construct direct connections to the Chester Valley Trail from various Township neighborhoods. Accordingly, East Whiteland Township is soliciting professional qualifications from engineering consultants for a one-time contract to perform professional services related to survey, preliminary engineering, permitting, and final design for a multi-surface, multi-use trail along Sidley Road, Moores Road and Mill Lane. The trail is intended to serve the nearby residential neighborhoods and offices as a connection to the Chester Valley Trail. Because of the nature and physical constraints of the proposed trail corridor, there will be multiple solutions (treatments, widths, surfaces, etc.) for the trail. Where feasible the trail shall be 8'-12' in width and constructed with an asphalt surface. Pedestrian signals will be included in the design at the crossing of Route 401 (Conestoga Road) as required. This new trail is supported by the residents of the adjacent Spring Mill Farm neighborhoods, St. Gobain/CertainTeed Corporation (20 Moores Road) and various Township plans and studies. These studies include the 2016 Comprehensive Plan, the draft Parks, Recreation, and Open Space (PROS) Plan, and the Sidley Road to CVT feasibility evaluation study prepared in 2019. These studies all recommend creating pedestrian and bicycle connections from neighborhoods and business centers to the Chester Valley Trail. Questions and comments are to be directed to Steven Brown, Assistant Township Manager at sbrown@eastwhiteland.org. The method of contractor selection has not been determined at this time.

Design

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

Documents for this project are exclusively Plans. If Specifications become available, we will add them here.

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
369
Active Projects
181
Bidding Soon
2,917
All Active Projects
1,427
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

img_map_placeholder

Sidley Rd & Mill Ln, Charlestown Township, PA

Related To This Project


Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.