Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Demolition, site work, paving and new construction of a civil project in Sheridan, Oregon. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; for paving for a bridge / tunnel; and water / sewer project.
The work will consist of replacing Bridge #11822 with a new vehicular bridge, AC pavement, water quality swale, and other items detailed in the plans and specifications, located in Yamhill County, Oregon. The Geotechnical, Hydraulic, and Stormwater reports are available upon request. Engineers Estimate ranges from $700K to $775K. Each bidder must identify whether the bidder is a resident bidder, as defined in ORS 279A.120. If a bid is received from a non-resident bidder, the provisions outlined in ORS 279A.120 will apply to said bid after the bid is opened and before the contract is awarded. No bid shall be received or considered unless the bidder is registered with the Construction Contractors Board as specified in OAR 137-049-0230. The Board of Commissioners, Yamhill County, reserves the right to waive minor informalities and to reject any or all bids that do not comply with prescribed public contracting procedures and requirements, including the requirement to demonstrate the bidders responsibility under ORS279C.375(3)(b), or if Yamhill County finds that it is in the public interest to do so. Each Bidder shall submit the subcontractors disclosure form required by OAR 137-049-0360 within two (2) working hours after the bid closing (prior to 4:00 p.m.) in a separate envelope marked Gopher Valley Road Bridge Replacement Subcontractors Disclosure Form. No bid will be received or considered by the County Engineering Manager unless the bid contains a statement by the bidder that the provisions of ORS 279C.530 shall be complied with. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.
Bid Results
Bridges / Tunnels
$1,088,089.00
Public - County
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
February 7, 2023
March 9, 2023
SW Gopher Valley Rd, Sheridan, OR
Related To This Project
Sheridan, OR
Bid Date: Mar 08 2023
Sheridan, OR
Bid Date: May 18 2023
Sheridan, OR
Bid Date: Sep 29 2023
Sheridan, OR
--
Sheridan, OR
Bid Date: Jul 29 2021
Sheridan, OR
Bid Date: Jul 16 2024
Sheridan, OR
Bid Date: Jul 16 2024
Sheridan, OR
Bid Date: Jul 25 2024
Sheridan, OR
Bid Date: Jan 24 2023
Sheridan, OR
--
Sheridan, OR
--
Portland, OR
Bid Date: Feb 07 2023
Salem, OR
Bid Date: Mar 02 2023
The Dalles, OR
Bid Date: Feb 14 2023
Happy Valley, OR
Bid Date: Jun 06 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.