Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
This is a service / maintenance or supply contract in Seffner, Florida. Contact the soliciting agency for additional information.
Counties: Hillsborough Stormwater Pond Structure Routine Permit Compliance Limits: Midpoint Project(s): 43904617208(*) Federal Aid No: N/A Total Roadway Length: 0.000 Miles Contract Days: 365 Total Bridge Length: 0.000 Miles Total Proposal Length: 0.000 Miles Contract Execution Days: 10 Special Start Date: N/A Aquis/Flexible Start Time: The work under this Contract consists of stormwater pond structure and component features, routine and permit compliance maintenance/repair for Stormwater and Pond Facilities in Hillsborough County, District 7. Contract will be awarded at the full budgetary amount of $284,250.00, low bid will set the unit price. The quantities shown on the Bid Price Proposal are approximate and only represent estimated planned requirements based on historical or specific project needs. The Department does not guarantee any maximum or minimum quantity, any range of quantities, or the exact quantities shown for each bid item. The Department's estimated quantities and the Contractor's bid price will be used to calculate a total bid amount. This total bid amount will then be used to determine the low bidder; however, actual payment under the awarded contract will be based on actual quantities completed. For this Contract in which specific sites are not identified at the time of letting, the Engineer will issue a Work Document. Work Documents will identify the location, description, amount of work to be accomplished, and the number of calendar days to complete the work. Contractors must have a current certificate of qualification in accordance with Florida Statute 337.14(1) and Rule Chapter 14-22, Florida Administrative Code, on the date of the letting to bid on construction projects over $250,000.00 as established by the Department's budget. For bids over $150,000.00, the standard proposal guaranty of 5% of the bid will be required, unless otherwise stipulated in the proposal advertisement. A Proposal Guaranty of not less than five percent (5%) of the total actual bid in the form of either a certified check, cashier's check, trust company treasurer's check, bank draft of any national or state bank, or a Surety Proposal Guaranty made payable to the Florida Department of Transportation must be received for each bid in excess of $150,000.00 A 100% Payment and Performance Bond will be required for all projects. All work is to be done in accordance with the Plans, special Provisions of the State of Florida Department of Transportation. FDOT - Call Order: 007 - Stormwater Pond Structures Routine and Permit Compliance Maintenance and Repair
Award
Water / Sewer
$375,650.00
Public - State/Provincial
Service, Maintenance and Supply
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 13, 2022
April 22, 2022
Multiple Locations, Seffner, FL
Related To This Project
Seffner, FL
Bid Date: Apr 13 2022
Seffner, FL
Bid Date: Apr 13 2022
Seffner, FL
Bid Date: Mar 02 2022
Seffner, FL
Bid Date: May 27 2022
Seffner, FL
Bid Date: Jul 20 2022
Seffner, FL
Bid Date: Jul 19 2022
Seffner, FL
Bid Date: Aug 04 2022
Seffner, FL
Bid Date: Aug 08 2022
Seffner, FL
Bid Date: May 11 2022
Seffner, FL
Bid Date: May 25 2022
Seffner, FL
Bid Date: May 13 2022
Seffner, FL
Bid Date: May 11 2022
Seffner, FL
Bid Date: Nov 19 2021
Seffner, FL
Bid Date: Mar 01 2022
Seffner, FL
Bid Date: Mar 01 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.