BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a road / highway in Bellvue, Colorado. Completed plans call for site work for a road / highway.

Question Acceptance Deadline 03/23/2022 12:00 PM EDT Questions are submitted online No Larimer County Fleet Services is considering bids to enter into a contract for the removal and disposal of the existing above-ground storage tank (AST) system and installation of a new AST system at the Larimer County Stove Prairie Road and Bridge (RAB) Shop located at 17290 Rist Canyon Rd, Bellvue, CO 80512. The works consists of, Providing all equipment, materials, and labor as may be required for the removal and disposal of the existing AST system. Providing an approximately 500-gallon temporary diesel fuel storage tank and dispenser to fuel onsite vehicles until new system is operational (Contractor not responsible for providing fuel). Providing all equipment and labor as may be required for the complete installation of the new AST system,except for the above ground storage tank. The County will provide a newly purchased 3,000-gallon dualcompartmentUL2085 AST (Contractor responsible for coordinating delivery with tank supplier). Providing all equipment, materials, and labor as may be required to install a new 500-gallon DEF AST and dispensing system. Vendors need to submit all information as one (1) pdf file please: 1. Bid Form 2. Bid Bond 3. Bid Schedule 4. Anti-Collusion Affidavit 5. Certificate of Intent to Sublet 6. References 7. Evidence of Coverage Certificate (EOC)

Award

Roads / Highways

$183,025.00

Public - County

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
200
Active Projects
92
Bidding Soon
1,308
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 1, 2022

Project location map

17290 Rist Canyon Rd, Bellvue, CO

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.