BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Kailua, Hawaii. Completed plans call for the renovation of a educational facility.

Furnish labor, materials and equipment necessary to install new window A/C units at Kailua Intermediate School, 145 Kainalu Dr. Kailua, HI 96734. Fifty-five (55) 23,000 BTU Window A/C. Friedrich KUHL model KCL24A30B with FreshAire MERV 13 Filtration or approved equal in rooms: Building B (east wing): B-108 (2 units), B-109 (2 units), B-110 (2 units), Building B (middle wing): B-105 (4 units), B-106 (3 units), B-107 (2 units), Building B (west wing): B-101 (2 units), B-102 (2 units), B-103 (2 units), B-104 (2 units) Building C (east wing) C-115 (4 units), C118 (2 units), C218 (4 units) & C220 (2 units) Building C (west wing) C-111 (2 units), C-112 (2 units), C-113 (2 units), C-114 (2 units), C-213 (2 units), C-214 (2 units), C-214 (2 units), C-215 (2 units), C-216 (2 units) & C-217 (2 units) Required Delivery Date: 04/29/2022 Unless otherwise indicated, questions regarding this solicitation must be directed, via email or phone, to the Contact Person. All questions shall be submitted to the Point of Contact no later than COB March 9, 2022 by phone or email. Awarded Contractor may start upon receipt of the award notice and must complete the project by COB April 29, 2022. Air Conditioning Units: 1. Before ordering equipment, provide specifications of A/C units to Project Coordinator for approval. 2. All units must be Energy Star-rated with a minimum CEER of 10.3. 3. All A/C units shall be installed with condensation drain lines. 4. Any equipment and/or installation changes identified during the pre-bid meeting/walkthrough shall be verified and approved by the Project Coordinator. Changes will be posted as an Addendum to the Scope. 5. All AC units will be framed with painted 2 x 4. 6. All wood around the AC units will be painted (interior and exterior). Electrical: 1. Contractor shall provide all necessary components for a complete installation of all A/C units; including but not limited to conduits, wiring, outlets, etc. Patching 1. All penetrations through walls/windows shall be completely sealed. 2. All added and/or replaced lumber and/or plywood shall be patched and painted. Wood trim shall be used for gaps larger than 1/4 inch. 3. Any damages caused by the Contractors work shall be properly patched and painted to match surrounding areas. Windows/Louvres 1. Windows and louvres must be operational post-installation. Project is tentatively scheduled to commence upon award of contract and must be completed by April 30, 2022. A performance bond is required for all projects $50,000 and above.

Award

Educational

$38,553.00

Public - State/Provincial

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
55
Active Projects
24
Bidding Soon
285
All Active Projects
112
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 18, 2022

April 18, 2022

April 30, 2022

img_map_placeholder

165 Kaiholu St, Kailua, HI

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.