BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a stadium in New Orleans, Louisiana. Completed plans call for the renovation of a stadium.

The $450 million Caesars Superdome Renovation consists of 1,935,125 square feet of renovations for the New Orleans Saints stadium. A scope breakdown on Phase 4 and 5 has not been released. As of January 12, 2023, construction is underway and commenced June 2022 __________________________________________________________________________________________________________________________________________________________ The Saints have unveiled the latest updates to the Envision the Future transformation of the Caesars Superdome. It's part of a five-year project that is expected to be completed in 2024. The goal is to transform the fan experience and functionality, and those attending Saints games this season will be the first to experience this evolution. SUPERDOME RENOVATIONS - WHAT YOU NEED TO KNOW Work in the Superdome started on Monday, Jan 9, 2023 just hours after the Saints season ended, with the west exterior concourse being layered with door frames. Those “frames” were the drywall brackets that served as anchors for the temporary walls that framed the concourses throughout the 2022 season, which allowed work for Envision the Future to continue. The temporary walls quickly came down in multiple areas and new steel beams began flowing into Caesars Superdome. The latest phase “began” primarily on the east sideline, with demolition work commencing on the 100-plaza level all the way to the 650 levels. 40,000 square feet of ramps had been removed on the east side Gate C, and so, this year the build back is creating a new experience for fans on the east sideline. At the same time this offseason, workers have been removing 40,000 square feet of ramps on the west side to open the space needed for the same amenities created on the east sideline. The 100 Plaza on the East side has been widened and new fan facing amenities have been added. The Caesars Legends Sideline Club now begins on the 200 Level East side. The concourse on the 200 east sideline loges has been updated and the east 200 level concourse is also considered to be inside the sideline Legends club. There are tunnels or hallways at each end of the concourse allowing patrons to flow freely between concessions and restrooms on the concourse and field side back to the sideline club that sits along the building’s exterior wall. The Caesars Legends Sideline Club will provide guests with a much wider footprint to enjoy, a common theme that will be touched on throughout this series. The East Sideline 300 level suites were also gutted during this phase, with the redesigned space taking full advantage of the added space by housing newer and much longer suite accommodations (think of it as a modern adaptation on a New Orleans shotgun Caesars Superdome style!). The 300 level suites on the East side have practically doubled in length, with the same exact thing happening to the West sideline suites in 2024. Without the ramps on the east side, there is also much more room on the 300 level for new restrooms and pantries for hot and cold food preparation. Meanwhile, after taking down the temporary walls at Gate C, elevator shafts were created and many will be ready to whisk guests directly to and from the club and suite levels in rapid fashion, beginning with this season. With the temporary walls gone on the 400-suite level, the new escalators and atriums in the corners have come into full view. The new atriums (which will serve as an entire segment unto itself in the coming days), will maximize on quite a bit of previously unused space. The new, finished looks of the atriums on the corners of the Caesars Superdome are brighter and project the feeling of spaciousness. In the upper corners of Caesars Superdome, work is nearing completion on the standing room only decks or “SROs,” on the 650 levels in the northeast and northwest corners. The new standing room only decks, in each quad and the new escalators from the 500 level to the 650 levels are set to be ready for the upcoming season. The end zone valley on 450 level at Gate A is also getting a complete makeover with steps replacing the ramps along with new concessions and restrooms. Thus, the East side will have the new amenities in place this season (August completion). The ramps on the west side will be gone by the start of this season, and the temporary walls will be in the place there allowing work to continue the west sideline during the season when feasible. The west sideline is not without some new items to celebrated 2023 as the northwest atrium at Gate H will be complete and ready for the upcoming football season. In addition, the southeast quad at Gate D is getting the same renovation and atriums now constructed in the northeast and northwest quads. Tom Benson’s corner, a replica of the office of the late Saints Owner Tom Benson, with all of its artifacts safely stored has been removed. The 200-level Iberville Club above it also gone, and the Stadium Club on the 300 level has also been removed to make room for the third atrium in the southeast quad to be ready for the 2024 season.

Occupancy

Arenas / Stadiums

$200,000,000.00

Public - State/Provincial

Renovation, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
97
Bidding Soon
1,072
All Active Projects
527
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

June 13, 2022

February 1, 2025

img_map_placeholder

1500 Sugar Bowl Dr, New Orleans, LA


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.