Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Ware, Massachusetts. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; water / sewer project; and water / sewer project.
The Town of Ware is seeking bids for the "Ware Mass Central Rail Trail Phase II" project. This phase of the project is to install a stone dust surface on the trail to complete the portion of the Mass Central Rail Trail between Longview Avenue and Mountain View Drive. This work will include approximately .75 miles of the MCRT trail, involve grading for drainage, and grading near two bridge crossings for ADA accessibility. More detail will be provided in the scope of services packet. This phase of the project will take place along two portions of the MCRT between Longview Avenue and Malboeuf Road, and the second which between Malboeuf Road and Mountain View Drive (shown on Item #1). This work will include approximately .8 miles of the MCRT trail, which is currently under use and open to the public. The Town is looking for the following items to be completed with this work: 1. Regrade the portion of trail East of Longview Ave. to create a drainage swale along the north side of the trail. 1 1/2 " crushed gravel material should be used to raise the grade of the trail sufficiently enough to allow positive water flow to the swale. 2. The section of trail halfway between Longview Ave and Malboeuf Rd. should be graded to eliminate the low area holding water in the trail. Drainage swale along the side of the trail is to be created to allow for proper drainage of the trail surface. 3. Lower the manhole cover to the east side of the foot bridge on the east side of Malboeuf Rd. to lessen the steep grade of the trail between the manhole cover and the bridge. This is to make the trail more ADA accessible. 4. Raise the grade of the trail on the west side of Mountain View Dr. to create less of a grade and a more level approach to the road. 2. The section of trail halfway between Longview Ave and Malboeuf Rd. should be graded to eliminate the low area holding water in the trail. Drainage swale along the side of the trail is to be created to allow for proper drainage of the trail surface. 3. Lower the manhole cover to the east side of the foot bridge on the east side of Malboeuf Rd. to lessen the steep grade of the trail between the manhole cover and the bridge. This is to make the trail more ADA accessible. 4. Raise the grade of the trail on the west side of Mountain View Dr. to create less of a grade and a more level approach to the road. 5. Lay hard pack material on MCRT surface consisting of 3/8" dense grade stone dust at a minimum of 3" depth. Material should be applied with a paver and compacted with a vibratory roller. 6. All drainage swales shall be lined with 3" angular crushed stone to mitigate erosion. Lay stone covering on 4000 feet of Ware River Valley Rail Trail. Drainage and ADA grading near stream crossings
Award
Roads / Highways
$69,750.00
Public - City
Paving, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 7, 2022
May 9, 2022
Malboeuf Rd, Ware, MA
Related To This Project
Ware, MA
Bid Date: Oct 11 2019
Ware, MA
Bid Date: Oct 31 2023
Ware, MA
Bid Date: Nov 21 2023
Ware, MA
Bid Date: Dec 06 2023
Ware, MA
Bid Date: Jan 04 2024
Ware, MA
Bid Date: Jan 04 2024
Ware, MA
Bid Date: Apr 25 2024
Ware, MA
Bid Date: Jan 19 2022
Ware, MA
Bid Date: Nov 18 2021
Ware, MA
Bid Date: Jun 22 2023
Ware, MA
Bid Date: May 24 2023
Ware, MA
Bid Date: Jun 17 2020
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.