BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a water / sewer project in Henderson, Kentucky. Completed plans call for the construction of a water / sewer project; and for site work for a water / sewer project.

One composite style 2.0 MG elevated water storage tank o All associated piping o All electrical work o Site work The allotted time for construction of Contract 22-02 is 480 calendar days. Liquidated damages for non-completion are $1,000 per calendar day. The CONTRACT DOCUMENTS may be examined at the following locations: Henderson Water Utility, 111 Fifth Street, Henderson, KY 42420 and J. R. Wauford & Company, Consulting Engineers, Inc., 2835 Lebanon Pike, Nashville, TN 37214. Please contact QuestCDN at 952-233-1632 or info@questcdn.com for assistance in free membership registration, downloading, and working with the digital project information. Inquiries should be directed to the project manager, Stephen C. Lee, P.E., (615) 883-3243, stephenl@jrwauford.com. Bid bond, City Occupational License, and other requirements apply to bidders. The Owner reserves the right to reject any and all bids, to waive informalities, and to negotiate with the apparent qualified best bidder or bidders to such extent as may be necessary. No bidder may withdraw his bid for 90 days, while the Owner considers the bids. Mutually agreed upon time extensions may be made if necessary. Est. Value:$ 5,500,000.00 General contractors shall meet the following pre-qualification requirements to be eligible to bid on this contract: 1. Pre-qualification information required herein shall be emailed to stephenl@jrwauford.com on or before Friday, March 25, 2022. Prospective bidders are responsible for confirming receipt of pre-qualification information by calling 615-883-3243. The prospective bidder shall provide evidence of general ability to perform similar work in a timely manner by submitting the project name, scope of work, allowed and actual time of completion, and a contact person for three previous projects of this general nature constructed within the past ten (10) years. Alternatively, the prospective bidder shall list previous, specific experience on projects completed for the Henderson Water Utility in the past ten (10) years. After registering, you will receive a confirmation email including the information required to join the meeting. If you do not receive the confirmation email, please check your spam folder. Project value: $5 to $6 million *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Bid Results

Water / Sewer

$5,460,700.00

Public - City

Subscribe For Documents

17 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
26
Bidding Soon
373
All Active Projects
203
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

June 13, 2022

img_map_placeholder

To Be Determined, Henderson, KY


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.