BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Muskego, Wisconsin. Completed plans call for site work for a playground / park / athletic field; road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Electronic bids must be submitted on website for a non-refundable fee of $30.00. A bidder's qualification statement must be delivered to City of Muskego at least 3 days before the bid opening date. If the successful bidder fails to execute the contract and furnish payment and performance bonds within 15 days after the award, the Check or Bid Bond shall be forfeited to City of Muskego as liquidated damages per Wisconsin Statues. No bid may be withdrawn for a period of 90 days after the opening date. Construction time is of the essence. Completion delays are subject to liquidated damages. City of Muskego reserves the right to accept the most advantageous bid, or to reject any and all bids. Award of Work described herein is subject to the provisions of the Wisconsin Statutes. Pre-Qualification: Yes The purpose of this study was to explore the subsurface conditions within the existing roadways and to develop geotechnical design criteria for the proposed pavement replacements. PSI's scope of services included drilling 12 soil test borings, select laboratory testing, and preparation of this geotechnical report. The scope of services did not include an environmental assessment for determining the presence or absence of wetlands, or hazardous or toxic materials in the soil, bedrock, surface water, groundwater, or air on or below, or around this site. Any statements in this report or on the boring logs regarding odors, colors, and unusual or suspicious items or conditions are strictly for informational purposes. Silt fence. 1. Description: Provide, maintain, remove silt fence, and restore surfacing. Includes; removal and disposal of trapped sediment. Includes; all material, tools, equipment, labor and mobilization to complete work. 2. Measurement: By lineal feet along the base of fence provided, maintained, and removed from center of post to center of post. 3. Payment: At Contract unit price per linear foot

Bid Results

Roads / Highways

$159,336.00

Public - City

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
158
Active Projects
70
Bidding Soon
1,685
All Active Projects
742
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 31, 2022

May 2, 2022

img_map_placeholder

Multiple Locations, Muskego, WI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.