BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 7, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Poplar, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; bridge / tunnel; and bridge / tunnel.

Minong - Solon Springs, CTH M - Wis. Central Ltd. RR; Douglas County; 1196-00-61, WISC 2022 425; USH 53; 8.010 Miles; Base, Concrete Pavement, HMA Pavement, Asphaltic Surface, Beam Guard, Pavement Marking, Concrete Pavement Repair, and Culverts. Estimated Range $5,000,000 - $5,999,999 Contract Completion Time: 50 Working Days With each sealed proposal, the bidder must include a properly executed bid bond or a cashier's check, certified check, bank's check, or postal money order in the amount designated on the Highway Work Proposal made payable to the Department. Certified checks shall be drawn on the account of the bidder submitting the proposal. The bidder may also satisfy the proposal guaranty requirements by having a properly executed annual bid bond on file with the Department. Contractors should submit all questions concerning plans and/or proposals through Website. This process is documented and can be found at Website. WISDOT - 014 - Minong - Solon Springs, CTH M - Wis. Central Ltd. RR *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$6,880,543.00

Public - State/Provincial

Paving, Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
38
Active Projects
26
Bidding Soon
264
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 14, 2022

August 22, 2022

Project location map

US-53, Poplar, WI

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.