BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 11, 2024 at 8:00 PM

Updated May 12, 2024

Site work and renovation of a water / sewer project in Signal Hill, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

Project Category Code: Buildings Rehabilitation/Renovation, Buildings/Public, Culverts, Waterways, Stormwater Channels, Demolition/Building Removal/Hauling/Salvage, Wastewater Treatment Plant Improvements, Control Panels Replacement/Repair/New Installation, Fittings and Valves, Erosion Control/Slope, Bank Stabilization, Concrete/Shotcrete/Sprayed, Fire Protection, Detection, Suppression, Landscaping, Excavation, Street/Road Materials, Landfills, Waste Handling Facilities, Paving (Asphalt or Concrete), Light, Heat, Power, Portable Toilets, Materials, Equipment and Supplies, Miscellaneous, Pipe Lining, Mechanical Systems, Commercial Waste Removal, Water and Wastewater Facilities, Paving (Highway, Road or Street), Sewer Inspection/Rehabilitation, Instrumentation, 906-00 Architectural Services, Professional, Professional/Technical Services, Electrical, Manhole Rehabilitation, Heating, Ventilation, Air Conditioning (HVAC), Removal and Replacement of pipe, Painting, Pumps or Pump stations, Water/Wastewater Infrastructure, Geotechnical Description: The Project will upgrade and repair the existing pumping plant and includes installation of a permanent standby generator; construction of a new below ground electrical and control room; rehabilitation of the existing sewage wetwell; replacement of three existing pumps and associated piping; civil site improvements; upgrades to the existing electrical, instrumentation, and mechanical systems, and all appurtenant work. The permanent standby generator, sewage pumps, and check valves will be furnished by the Districts. Est. Value Notes: $6,900,000 - $9,300,000 *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The Board of Directors may reject all bids. Unless all bids are rejected, award will be made to the low, responsive, responsible bidder. The work of construction must be completed within 450 days after the date in the Notice to Proceed.

Bid Results

Water / Sewer

$8,842,847.00

Public - City

Renovation, Site Work

59

26

12

5

Subscribe For Documents

55 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
652
Active Projects
322
Bidding Soon
3,603
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

July 8, 2024

Project location map

2200 E Spring St, Signal Hill, CA


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.