Site work, paving and new construction of a fire / police facility in Saint Charles, Missouri. Completed plans call for the construction of a 8,600-square-foot, two-story above grade fire / police facility.

As of August 15, 2022 , this project has not yet been awarded. The project is expected to be awarded on September 6, 2022. Scope of Work Page 1 of 8 The Owner Representative (OR) referred to below is Navigate Building Solutions, LLC. The Owner referred to below is the City of St. Charles MO. The Contractor referred to below is the General Works Contractor. This bid package includes, but is not limited to, the following: All work outlined by the project documents (plans and specifications) issued by JEMA Architects dated June 24, 2022 1. Contractor is aware of the potential for Liquidated Damages. Contractor shall be responsible to maintain scheduled items for the Contractor's work as included in the project master schedule below. Contractor shall reference the Construction Agreement contract draft provided in the bid documents, Contractor agrees to pay the Owner, or to deduct from the Contract Sum, not as a penalty, but as liquidated damages, the amounts listed in the contract drafts provided. 2. The draft Construction Agreement has been included. Contractor shall read and agree to these documents as part of the bid process. 3. Upon execution of this contract, this contractor must submit to the OR a detailed critical path baseline construction schedule outlining each construction activity and phase. This schedule must fall within the master project schedule outlined below and be submitted no later than twenty-one (21) days following execution of the contract. Contractor is required to provide updated work schedules on a weekly basis. Contractor’s detailed activity schedule/critical path schedule shall adhere to the master project schedule. Should the Contractor fall behind schedule by more than 5 work days due to the fault of this Contractor, the Contractor shall provide a recovery schedule to the Owner Representative within 5 days of request by the Owner Representative. Project Master Schedule/Milestone Dates: Receipt of Bids August 4, 2022 at 2:00pm Supplemental Bid Documents Due August 5, 2022 at 2:00pm Tentative Pre-Award Interviews August 6-7, 2022 at TBD Board Approval of Contractor August 16, 2022 Notice to Proceed (Day 1) September 9, 2022 Groundbreaking Date TBD by Owner Substantial Completion (Day ___*) *Based on Bidders Proposed Duration Completion of Punchlist/Final Completion 30 Day’s After Substantial Completion 4. The project is prevailing wage. All wages paid for work performed on site must comply with the Missouri Division of Labor Standards Annual Wage Order Number 29 for St. Charles County, Missouri. 5. Certified Payroll will be a requirement of this project. 6. Provide all supervision, labor, tools, equipment and materials to complete the work. 7. Perform all freight, unloading, loading, distribution and hoisting of materials. 8. Furnish, install, maintain and remove temporary on-site trailers and storage containers as required to perform the work. This contractor shall provide in the jobsite trailer a conference table and chairs for contractor weekly foreman meetings, bi-weekly Owner meetings, and other meetings as needed. *Addendum 1 has been issued.

Award

Fire / Police

$4,360,456.00

Public - City

New Construction, Paving, Site Work

Subscribe For Documents

25 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
41
Bidding Soon
826
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 4, 2022

September 1, 2022

img_map_placeholder

2817 Elm St, Saint Charles, MO

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.