Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work, paving and new construction of a fire / police facility in Saint Charles, Missouri. Completed plans call for the construction of a 8,600-square-foot, two-story above grade fire / police facility.
As of August 15, 2022 , this project has not yet been awarded. The project is expected to be awarded on September 6, 2022. Scope of Work Page 1 of 8 The Owner Representative (OR) referred to below is Navigate Building Solutions, LLC. The Owner referred to below is the City of St. Charles MO. The Contractor referred to below is the General Works Contractor. This bid package includes, but is not limited to, the following: All work outlined by the project documents (plans and specifications) issued by JEMA Architects dated June 24, 2022 1. Contractor is aware of the potential for Liquidated Damages. Contractor shall be responsible to maintain scheduled items for the Contractor's work as included in the project master schedule below. Contractor shall reference the Construction Agreement contract draft provided in the bid documents, Contractor agrees to pay the Owner, or to deduct from the Contract Sum, not as a penalty, but as liquidated damages, the amounts listed in the contract drafts provided. 2. The draft Construction Agreement has been included. Contractor shall read and agree to these documents as part of the bid process. 3. Upon execution of this contract, this contractor must submit to the OR a detailed critical path baseline construction schedule outlining each construction activity and phase. This schedule must fall within the master project schedule outlined below and be submitted no later than twenty-one (21) days following execution of the contract. Contractor is required to provide updated work schedules on a weekly basis. Contractor’s detailed activity schedule/critical path schedule shall adhere to the master project schedule. Should the Contractor fall behind schedule by more than 5 work days due to the fault of this Contractor, the Contractor shall provide a recovery schedule to the Owner Representative within 5 days of request by the Owner Representative. Project Master Schedule/Milestone Dates: Receipt of Bids August 4, 2022 at 2:00pm Supplemental Bid Documents Due August 5, 2022 at 2:00pm Tentative Pre-Award Interviews August 6-7, 2022 at TBD Board Approval of Contractor August 16, 2022 Notice to Proceed (Day 1) September 9, 2022 Groundbreaking Date TBD by Owner Substantial Completion (Day ___*) *Based on Bidders Proposed Duration Completion of Punchlist/Final Completion 30 Day’s After Substantial Completion 4. The project is prevailing wage. All wages paid for work performed on site must comply with the Missouri Division of Labor Standards Annual Wage Order Number 29 for St. Charles County, Missouri. 5. Certified Payroll will be a requirement of this project. 6. Provide all supervision, labor, tools, equipment and materials to complete the work. 7. Perform all freight, unloading, loading, distribution and hoisting of materials. 8. Furnish, install, maintain and remove temporary on-site trailers and storage containers as required to perform the work. This contractor shall provide in the jobsite trailer a conference table and chairs for contractor weekly foreman meetings, bi-weekly Owner meetings, and other meetings as needed. *Addendum 1 has been issued.
Award
Fire / Police
$4,360,456.00
Public - City
New Construction, Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 4, 2022
September 1, 2022
2817 Elm St, Saint Charles, MO
Related To This Project
Saint Charles, MO
Bid Date: Aug 31 2023
Saint Charles, MO
Bid Date: Aug 19 2022
Saint Charles, MO
Bid Date: Sep 02 2022
Saint Charles, MO
Bid Date: Oct 15 2020
Saint Charles, MO
Bid Date: Sep 22 2022
Saint Charles, MO
Bid Date: Oct 04 2022
Saint Charles, MO
--
Saint Charles, MO
Bid Date: Aug 29 2022
Saint Charles, MO
Bid Date: Apr 19 2022
Saint Charles, MO
Bid Date: Jul 07 2022
Saint Charles, MO
Bid Date: Aug 23 2022
Saint Charles, MO
Bid Date: Aug 31 2022
Saint Charles, MO
Bid Date: Aug 23 2022
Saint Charles, MO
--
Saint Charles, MO
Bid Date: Aug 16 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.