Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published August 1, 2022 at 8:00 PM
Updated September 14, 2023
Remodeling of a municipal facility in Camp Connell, California. Completed plans call for the remodel of a municipal facility.
The total bid proposal for this Agreement must not exceed $388,000. A bid proposal over $388,000 will be deemed non-responsive and will be rejected. The minimum percentage of DVBE participation is 3% for this solicitation unless another percentage is specified in the solicitation or the solicitation is exempt from DVBE participation. As required by Executive Order S-02-06, the California Department of Transportation (Caltrans) is committed to meeting the State 25 percent (25%) Small Business (SB) participation goal. Certified SBs, Micro Businesses (MB), SBs for the purpose of Public Works (SB-PW), and contractors willing to commit to subcontracting a minimum of twenty-five percent (25%) of their net bid price to certified SBs, MBs (if applicable), or SB-PWs, are encouraged to submit bids. In the event a potential prime contractor is unable to attend the Optional Site Inspection, an authorized representative may attend on its behalf. The representative may only sign in for one (1) company. Subcontractors may not represent a potential prime contractor at a Pre-Bid Site Inspection Bidders must sign in (on the sheet provided) upon arrival and sign out upon completion of the walk-through activities. Failure to comply with these provisions may result in the rejection of your bid. Caltrans will conduct the site inspection of the facilities and disseminate any additional information to participants, if necessary. Questions regarding this IFB must be submitted in writing by July 21, 2022. Bidders are encouraged to submit their written questions via e-mail to Michael.Dean@dot.ca.gov. Written questions must include: the individual's name, firm name, complete address and must reference IFB No. 10A2430 Questions must be sent to one of the following: Email: Michael.Dean@dot.ca.gov Or mail to: California Department of Transportation (Caltrans) Division of Procurement and Contracts Attention: Michael Dean 1727 30th Street, MS 65 Sacramento, CA 95816. Initial bid opening results will be posted online on the Division of Procurement and Contracts through electonically by 3:00 p.m. on the day following the bid opening. Payment Bond (ADM-2009) Requirement: If the successful bidder bid exceeds $25,000, the successful bidder shall furnish a Payment Bond for not less than 100 percent (100%) of the total amount payable by the terms of this Agreement. The Payment Bond is due prior to the start date of work. No work may commence without receipt of a valid Payment Bond. The Payment Bond must be in effect at all times for the duration of the Agreement. If the Payment Bond expires during the term of the Agreement, a new Payment Bond must be provided to Caltrans Contact Manager not less than 10 business days prior to its expiration. Failure to maintain a Payment Bond for the full term of this Agreement will be grounds for termination for default in addition to other legal remedies Caltrans may have. Inadequate or lack of a Payment Bond does not negate Contractor obligations under this Agreement
Bid Results
Municipal
$271,150.00
Public - State/Provincial
Remodeling
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
July 28, 2022
September 1, 2022
5507 Meko Dr, Camp Connell, CA
Related To This Project
Camp Connell, CA
Bid Date: May 09 2025
Fort Irwin, CA
Bid Date: Jul 22 2022
Rancho Santa Fe, CA
Bid Date: Jun 29 2022
Santa Ana, CA
Bid Date: Aug 01 2022
Fairfield, CA
Bid Date: Aug 01 2022
Lompoc, CA
Bid Date: Jun 17 2022
Fountain Valley, CA
--
Fountain Valley, CA
--
Fountain Valley, CA
--
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
