EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published August 1, 2022 at 8:00 PM

Updated September 14, 2023

Remodeling and renovation of a military facility in Fort Irwin, California. Completed plans call for the remodel of a military facility.

This is a Design-Build Project The objective of this project is for the Contractor to provide all labor, materials and equipment necessary to Replace Building Automation System Mary Walker Clinic, Bldg. 170, Weed Army Community Hospital, in accordance with all Federal, State, and Installation codes and laws, to include preparation of a design as discussed below. The contractor shall provide a full replacement of the BAS serving the Mary Walker Army Medical Health Clinic, perform a Re-Commissioning Test Adjust Balance of the facility back to the latest most accurate system design and sequence of operations; have the contractor demonstrate the validation of the design through an arduous functional performance test which stresses the HVAC to its design limit; and provide both building owner and building maintainer/operator with extensive training in the theory and principle of design, the many new features of the BAS system installed, how to optimize the system for most efficient and reliable service, how to recognize abnormal conditions and how to react and troubleshoot said deviations of performance, how to maintain the system sensory and actuation devices. The functional testing of the system and the training will in part be provided by the contractor's Designer of Record, the system manufacturer, and the installer. But not limited to please review the SOW for a complete project description. Magnitude of Construction: $1M - $5M Prevailing Wages Apply. Contract Duration = 365 days *New RFI Report has been released.

Post-Bid

Military

$5,000,000.00

Public - Federal

Remodeling, Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Execution and Closeout Requirements, Examination and Preparation
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Tunneling and Mining
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
11
Active Projects
8
Bidding Soon
132
All Active Projects
48
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 22, 2022

August 29, 2022

img_map_placeholder

To Be Determined, Fort Irwin, CA

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

DB Replace Building Automation System Bldg. 170

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.