Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published July 8, 2022 at 8:00 PM
Updated September 14, 2023
Site work, paving and new construction of a bridge / tunnel in Holyoke, Massachusetts. Design plans call for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
This project involves replacing two bridges on Route 141 (Appleton Street) where the bridges cross over the First Level and Second Level Canals. The new bridges will be two-span concrete bridges supported by abutments that will be constructed behind the existing canal walls. The existing roadway and sidewalk widths will be maintained. A decorative bridge rail will be installed that is compatible with the proposed Holyoke Canalwalk and the historic character of the area. This requires that a roadway curb rail be used to separate the roadway from the sidewalk and pedestrian rails as the proposed bridge rail is not a crash tested acceptable design. As of July 8, 2022, further derails regarding design and construction timelines have not been identified.
Design
Bridges / Tunnels
$9,130,000.00
Public - State/Provincial
New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 19, 2024
Appleton St, Holyoke, MA
Related To This Project
Holyoke, MA
Bid Date: May 19 2022
Holyoke, MA
Bid Date: Jul 13 2022
Holyoke, MA
Bid Date: Apr 27 2022
Holyoke, MA
Bid Date: Jun 09 2022
Holyoke, MA
Bid Date: Jun 16 2022
Holyoke, MA
Bid Date: Aug 01 2022
Holyoke, MA
Bid Date: Jun 08 2022
Holyoke, MA
Bid Date: Aug 03 2022
Holyoke, MA
Bid Date: Jun 15 2022
Holyoke, MA
Bid Date: Aug 31 2020
Holyoke, MA
--
Holyoke, MA
Bid Date: May 04 2022
Holyoke, MA
Bid Date: Jun 15 2022
Holyoke, MA
Bid Date: Jun 10 2022
See the Projects and Companies Shaping 2026 Before Anyone Else
Start the New Year with a clearer view of the construction market. Unlock early access to commercial project data that keeps your pipeline full and your competitors behind. Sign up today for the project and contact data that others won't discover until its too late.
