BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

This is a service / maintenance or supply contract in Olympia, Washington. Contact the soliciting agency for additional information.

The Work required for this Project includes: Providing all labor, equipment, and materials necessary for paving, general civil, and fencing, alterations, additions, and repairs when requested by the Engineer on Port of Tacoma property. The Port does not guarantee a certain amount of work. The work will be assigned by Task Orders; each Task Order will address the scope of work and time of completion, and shall be performed in accordance with the Contract Documents and Task Order provisions. No pre-bid or site visit is scheduled for this project. Bid Security: Each Bid must be accompanied by a Bid security in an amount equal to five (5) percent of the Base Bid in a form allowed by the Instructions to Bidders. All businesses are required to have training before bidding on public works projects and prevailing wage under RCW 39.04.359 and RCW 39.12, or is on the list of exempt businesses maintained by the Department of Labor and Industries. The bidder must designate a person or persons to be trained on these requirements. The training will be provided by the Department of Labor and Industries or by a training provider whose curriculum is approved by the Department of Labor and industries. Any questions to the Port may be emailed to procurement@por-toftacoma.com, No oral responses will be binding by the Port.. Questions will not be accepted after seven (7) days prior to the Bid Date. The Contractor shall achieve all interim milestones as set forth in the Executed Task Orders and Final Completion of the entire Work not later than 730 calendar days from execution of the Contract, subject to adjustments of this Contract Time as provided in the Contract Documents, or funds are depleted, whichever comes first. Provisions for liquidated damages as a reasonable estimate of future loss, as of the date of this Agreement, are included in the Contract Documents. The parties agree that the stated liquidated damages are reasonable and not penalties individually nor cumulatively. The liquidated damages for failure to achieve Substantial Completion based on ececuted Task Order required date and shall be determined at the time of Task Order Proposal execution. If any, will appear on the executed task order Payment does not relieve Contractor of obligations. Payment to the Contractor of progress payments or final payment does not relieve the Contractor from its responsibility for the Work or its responsibility to repair, replace, or otherwise make good defective Work, materials, or equipment. Likewise, the making of a payment does not constitute a waiver of the Port's right to reject defective or non-conforming Work, materials, or equipment (even though they are covered by the payment), nor is it a waiver of any other rights of the Port.

Post-Bid

Roads / Highways

$3,000,000.00

Public - City

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
72
Active Projects
46
Bidding Soon
720
All Active Projects
254
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 30, 2022

April 29, 2022

img_map_placeholder

Multiple Locations, Olympia, WA


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.