BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2023 at 8:00 PM

Updated January 26, 2024

Site work for a road / highway in Sioux Falls, South Dakota. Completed plans call for site work for a road / highway.

The City of Sioux Falls, SD, requests formal bids for Furnish and Apply Epoxy Pavement Markings for Stop Bars and Arrows. The City of Sioux Falls reserves the right to reject any or all bids, waive technicalities, and make award(s) as deemed to be in the best interest of Sioux Falls, SD. This work shall consist of furnishing and applying pavement marking materials for parking stalls, stop bars, lane use arrows, pedestrian crosswalks, and bike symbols on various city streets. The Contractor will use Epoplex LS-65 Epoxy Paint or an approved equal for the entire project. Prior to opening a lane of traffic to the public, all excess beads shall be removed. Surface Preparation for installation of Epoxy Paint shall include grinding of pavement to between 20 and 30 mils below pavement surface and removal of existing pavement marking. The Contractor shall also clean up, remove, and dispose of any material that has been ground off during surface preparation. The Contractor shall record the date the pavement markings were installed on each plan sheet furnished by the City of Sioux Falls. Questions pertaining to this bid request shall be directed to:Dan Moan City Engineering Office 231 N. Dakota Avenue Sioux Falls, SD 57104 (605) 367-8601 This work shall consist of furnishing and applying pavement marking materials for parking stalls, stop bars, lane use arrows, pedestrian crosswalks, and bike symbols on various city streets. The Contractor will use Epoplex LS-65 Epoxy Paint or an approved equal for the entire project. Prior to opening a lane of traffic to the public, all excess beads shall be removed. Surface Preparation for installation of Epoxy Paint shall include grinding of pavement to between 20 and 30 mils below pavement surface and removal of existing pavement marking. The Contractor shall also clean up, remove, and dispose of any material that has been ground off during surface preparation. The Contractor shall record the date the pavement markings were installed on each plan sheet furnished by the City of Sioux Falls. If needed, the City of Sioux Falls will provide the Contractor with a paper stencil of the bike symbols so that a form can be made for the application of these markings. The Contractor will encounter two sizes of lane use arrows, standard highway size and smaller urban area size. The contractor shall install the appropriate size arrow based on what is currently at that location.

Bid Results

Roads / Highways

$183,350.00

Public - City

Site Work

3

5

2

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
54
Active Projects
43
Bidding Soon
467
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 20, 2023

May 22, 2023

Project location map

Multiple Locations, Sioux Falls, SD

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.