BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Palatine, Illinois. Completed plans call for site work for a educational facility; and pipeline.

As of 04/21/2022 This project has not been awarded. The Work consists of providing new natural gas piping in the Building B boiler house utilizing the existing gas meter and service. C. Lump sum bid proposals will be received for this project at the scheduled time of receipt of bids and will be publicly opened and read aloud. All questions regarding the Bidding Documents shall be submitted to the Architect via email and /or fax to both Jewell Jackson (purchasing@harpercollege.edu) and John Wolfe (john.wolfe@rtmec.com). Replies will be issued to all bidders of record in the form of an Addendum. Questions received later than 2:00 p.m. prevailing time on April 1, 2022, may not be answered. Bids shall be submitted in an opaque sealed envelope addressed to: Harper College, Purchasing Department, located in A-Building, Room A217, 1200 W. Algonquin Road, Palatine, Illinois 60067. I. No bid may be withdrawn for a period of ninety days after the submission without the consent of the Board of Trustees. J. Any bid submitted unsealed, unsigned, fax transmission, e-mail, or received subsequent to the aforementioned date and time, may be disqualified and returned to the bidder. K. Harper College reserves the right to reject any or all bids or parts thereof, to waive any irregularities or informalities in bidding procedures, and to award the contract in a manner best serving the interest of the College. L. All bidders must comply with applicable Illinois Law requiring the payment of prevailing wages by all Contractors working on public works. Bidder must comply with the Illinois Statutory requirements regarding labor, including Equal Employment Opportunity Laws. M. Contractors shall pay not less than the prevailing rates of wages to all laborers, workmen, and mechanics performing work under this contract, and shall comply with the requirements of the Illinois Wages of Employees on Public Works Act (820 ILCS 130/1-12). N. Bidders shall comply with the Business Enterprise Program: Participation and Utilization Plan developed by Harper College. There is a 30 percent aspirational goal on the Contract.

Award

Pipeline

$116,300.00

Public - County

Site Work

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
191
Active Projects
100
Bidding Soon
2,106
All Active Projects
909
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 12, 2022

May 12, 2022

img_map_placeholder

1200 W Algonquin Rd, Palatine, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.