BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a communication facility in Palatine, Illinois. Completed plans call for site work for a communication facility.

As of February 7, 2024, per owner a design team has been identified and the project has been completed. The Village of Palatine, Illinois is soliciting qualified and interested firms to submit statements of qualifications for providing all services, supervision, labor and equipment necessary to provide the Village with Phase I and Phase II Engineering Services for the installation of fiber optic cabling to three locations within the Village of Palatine. All work shall conform to IDOT/FHWA policies and procedures for federal aid projects and will be completed under applicable BLR and BDE Manuals, and all applicable CDBG funding requirements including but not limited to disadvantaged/MBE and/or WBR requirements that may be required. All questions shall be submitted by email to Matt Barry and George Ruppert by 12:00 PM (CST) on May 25, 2022. A response to all questions received will be provided via email and posted after 4:00 PM (CST) on May 27, 2022. Project Information: The Village of Palatine will be installing fiber optic cabling to three locations in the Village. All three locations shall have a minimum of a 2 inch conduit with Corning fiber optic cable installed within. Anticipated Work items may include, but are not limited to, the following: Performing necessary survey work of the areas. Preparing all necessary reports, including: subsurface investigation of all potential utilities that may be in conflict with the proposed installation. Summarizing alternatives and recommendations and completing a Project Development Report. Obtaining any required IDOT/CCHD utility or ROW permits that may be required. Providing coordination for public involvement and coordination with public, utilities, local agencies and IDOT/CCHD. Completing the necessary Phase II plans, specifications and estimates as required based upon the approved Phase I design. The anticipated construction schedule for this project is 8 to 10 months including construction. The Village of Palatine may conduct interviews with and/or require presentations of the firms who submit acceptable or potentially acceptable qualifications as part of the SOI for this project. Ranking and Selection Information On the basis of the evaluations, interviews and presentations, the Village shall select no fewer than three firms which it determines to be the most qualified to provide services regarding the specific project. The Village shall then contact the top ranked firm and attempt to negotiate a contract. If a satisfactory contract cannot be reached with the top ranked firm, negotiations with that firm shall be terminated and the Village will start negotiations with the next highest ranked firm. Firm ranking will be based on the following criteria: (20%) - Technical Approach (20%) - Firm Experience (10%) - Specialized Expertise (25%) - Staff Capabilities (10%) -Work Load Capacity (15%) - Past Performance

Occupancy

Communication

$2,000,000.00

Public - City

Site Work

5

5

2

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
197
Active Projects
127
Bidding Soon
2,164
All Active Projects
953
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 31, 2023

img_map_placeholder

Multiple Locations, Palatine, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.