BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Stevens Point, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

The Curb, Gutter, and Sidewalk Repair Program shall consist of saw cutting existing concrete sidewalk and curb & gutter, removal of sidewalk and curb & gutter, grading of the sub-base, installation of new curb & gutter and sidewalk, asphaltic patching adjacent to curb removal and replacement, landscaping repair, installation of detectable warning fields at all curb ramp locations, and traffic control during construction. The contractor shall be responsible for traffic control in accordance with the MUTCD. Traffic control shall be in place prior to starting work to protect the traveling public and to protect the repair or installation areas from the time the items are removed until the repair or new curb & gutter or sidewalk is completed and can be opened to vehicular or pedestrian traffic; general cleanup including sweeping of the street after the pavement is removed and placed is also required. Locations for the work items contained in this contract are appended to these contract documents

Bid Results

Sidewalks / Parking Lot

$200,207.00

Public - City

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
23
Bidding Soon
252
All Active Projects
102
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 5, 2022

img_map_placeholder

Multiple Locations, Stevens Point, WI

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.