BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated October 24, 2023

Site work and paving for a mixed-use development in Palmyra, Wisconsin. Completed plans call for site work for a bridge / tunnel; for paving for a bridge / tunnel; road / highway; road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Project Category Code: Trenchless Utility Construction, Culverts, Waterways, Stormwater Channels, Sidewalks/Curbs/Gutters, Fittings and Valves, Erosion Control/Slope, Bank Stabilization, Fire Hydrant, Traffic Control Devices (Signals, Signing, etc.), Stormwater Improvements, Erosion Control - Temporary, Roadway Pavement Markings, Directional Bore, Storm Drain and Paving, Directional Drilling, Street/Roadway Reconstruction , Street/Road Pavement Marking, Utility Street Construction and Excavation, Sewer and Water Construction, Sitework/Excavating and Grading, Grubbing & Clearing, Signage, Water Infrastructure (Water Meters), Paving (Highway, Road or Street) Description: The work for which bids are asked includes the following: The project consists of the reconstruction of approximately 2100 L.F. of Main Street between Carriage Way and the Wisconsin & Southern Railroad, and reconstruction of approximately 1700 L.F. Northwest Street between Main Street and Maple Street. This includes but not limited to: 1. Roadside ditch grading 2. Replacement of culverts and storm sewer 3. Replacement of water main, hydrants, and water services including a section of jack and bore. 4. Installation of new base, hot-mix asphalt pavement, ADA compliant pedestrian ramps with detectible warning fields and painted crosswalks 5. Centerline pavement marking 6. Abandonment of existing watermain The anticipated substantial completion date is October 21, 2022 BIDDER is required to deliver the original certified check or bid bond within the 72 hours of bid opening to MSA Professional Services, Inc., Attn: Joe DeYoung, . The certified check or bid bond will be returned to the bidder as soon as the contract is signed, and if after 15 days the bidder shall fail to do so, the certified check or bid bond shall be forfeited to the OWNER as liquidated damages. No bid may be withdrawn within 60 days after the actual date of the opening thereof. The project, along Main Street in the Village of Palmyra, from a point 300 ft southwest of its intersection with Carriage Way to a point 100 ft southwest of its intersection with N 5th Street is funded in part by the Wisconsin Department of Transportation Municipal Street Improvement Discretionary (MSID) program. OWNER reserves the right to waive any informalities or to reject any or all bids.

Award

Roads / Highways

$919,517.00

Public - City

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
707
Active Projects
467
Bidding Soon
3,437
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 5, 2022

Project location map

Multiple Locations, Palmyra, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.