BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a fitness / recreation center in Factoryville, Pennsylvania. Completed plans call for the construction of a fitness / recreation center; and for site work for a fitness / recreation center.

In addition to the original signed bid, bidder shall submit 5 copies of their bid proposal. Bid Proposal shall be irrevocable for a period of sixty (60) days after the scheduled closing time for receiving Bids The Project will be bid as a Single Prime Contract. The work under the above Contract shall commence no later than June 23, 2022 and shall be substantially completed no later than May 1, 2023 It is the responsibility of the Contractor to supply the necessary manpower, materials and equipment to complete all Work in accordance with the above time schedule and the Lump Sum Price shall be based on the Contractor manning the Work to meet this schedule. Proposal Guarantee in the amount of ten percent (10%) of the Bid must accompany each bid in accordance with the Instructions to Bidders. Performance and Payment Bond equal to the full amount of the Contract price shall be provided by the successful Contractor. The Bonds shall be maintained in full force for a period of twelve (12) months after the date of Final Payment. The above General Outline of the principal features does not in any way limit the responsibility of the Contractor to perform all Work and furnish all labor, materials and equipment required by the Contract Documents. The Owner reserves the right to reject any or all bids. This project is in part funded through the Redevelopment Assistance Capital Program (RACP), which is a Pennsylvania Commonwealth grant program administered by the Office of Budget (OB). The successful contractor must be familiar with and shall comply with the RACP "Key Compliance Guidelines" (Refer to the Supplementary General Conditions for the Key Compliance Guidelines inclusive of but not limited to Prevailing Wage Act requirements). Bidders shall submit evidence with their bid proposal that they are qualified to and can complete the project under the conditions and requirements of the RACP grant.

Post-Bid

Fitness / Rec Centers

$500,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
166
Active Projects
74
Bidding Soon
975
All Active Projects
497
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

June 23, 2022

img_map_placeholder

To Be Determined, Factoryville, PA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.