BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 12, 2022 at 8:00 PM

Updated October 24, 2023

Renovation of a multi-residential development in Pittsburgh, Pennsylvania. Completed plans call for the renovation of a multi-residential development.

The Scope of Work Area includes but is not limited to selective demolition and restoration on the interior and exterior of the existing unit. The unit is unoccupied. The project shall be bid as s Single Prime. General Prime Contractor: The Scope of Work includes but shall not be limited to structural repair and restoration of existing window, masonry, gypsum board systems and finishes previously damaged by an automobile. All work necessary to complete the repairs shall be reflected in the General Contractor's bid. Electrical Prime Contractor: The Scope of Work includes but shall not be limited to miscellaneous electrical wiring in support of the General Construction. Cost shall be included in the General Contractor's bid. Plumbing Prime Contractor: The Scope of Work includes but shall not be limited to miscellaneous plumbing work in support of the General Construction. Cost shall be included in the General Contractor's bid. Demolition and Construction Phasing Occupant Disruption Schedule (DCPOD Schedule) shall be provided by each Contractor/Discipline to the General Prime Contractor within 14 calendar days from Notice to Proceed. For more information or questions, please contact Samantha Tirk @ 412- 456-5000 x 2900 or Samantha.Tirk@HACP.org Performance bonds are means to ensure that the contract is successfully completed. A performance bond on the part of the contractor for 100 percent of the contract price is required The Payment bond is a method of ensuring that the contractor pays the subcontractors and suppliers. A payment bond on the part of the contractor for 100 percent of the contract price HACP reserves the right to occupy and to place and install equipment in completed portions of the Work, prior to Substantial Completion of the Work, provided such occupancy does not interfere with completion of the Work. Such placement of furniture and limited occupancy shall not constitute acceptance of the total Work. If necessary, Architect will request additional information or documentation for evaluation within one week of receipt of an "Equal" product request. Architect will notify Contractor of approval or rejection of proposed "Equal" product request within 15 days of receipt of request, or seven days of receipt of additional information or documentation, whichever is later

Post-Bid

Multi-Residential

$300,000.00

Public - City

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
195
Active Projects
103
Bidding Soon
1,686
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 12, 2022

June 13, 2022

Project location map

1302 Ferris Ct, Pittsburgh, PA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.