BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 2, 2022 at 8:00 PM

Updated November 14, 2023

Renovation of a medical facility in Middletown, Connecticut. Completed plans call for the renovation of a medical facility.

Liquidated Damages: $ 1,126.00 Per Calendar Day Beyond Substantial Completion. $ 1,126.00 Per Calendar Day Beyond 90 days After Substantial Completion. Cost Estimate Range: $ 5,221,105.00 To $ 5,500,000.00 Prevailing Wage Rates: Prevailing wages are required on this project, in accordance with the schedule provided in Section 00 73 44 Prevailing Wage Rates, pursuant to Connecticut General Statutes (C.G.S.) Section 31-53 (a) through (h), as amended. Each contractor who is awarded a contract on or after October 1, 2002 shall be subject to provisions of C.G.S. 31-55a concerning annual adjustments to prevailing wages.

Bid Results

Medical

$5,927,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
840
Active Projects
364
Bidding Soon
6,877
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 4, 2022

August 10, 2022

Project location map

1000 Silver St, Middletown, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.