Demolition, site work, paving and new construction of a bridge / tunnel in New Bedford, Massachusetts. Conceptual plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.
Route 18 interchange, Mass Coastal railroad, County Street, Purchase Street, State Street and Weld Street. The 15 span I-195 bridge will be replaced with one continuous eight span steel girder bridge and two simple span steel stringer bridges. The remaining five spans will be replaced with highway embankment retained by Pre-cast Modular Gravity walls. Two multi span ramp bridges will also be replaced. The 400 foot long seven span bridge carries I-195 westbound off-ramp to Rt. 18 southbound (Ramp C) and the 650 foot long nine span bridge carries I-195 eastbound off-ramp to Rt. 18 southbound (Ramp F) will be replaced with highway embankment retained by Pre-cast Modular Gravity walls. Ramp F bridge over Weld Street will be replaced with a simple span steel girder bridge.. The new bridges will reuse a portion of the existing bridge piers and abutments. Repairs and upgrades will be made to the existing piers, abutments. These will be supplemented with sections of new piers and abutments. The interstate roadway will be widened 24 to 30 feet to accommodate four lanes traffic during staged construction and will result in ten foot wide breakdown lanes in both directions. The westbound weaving segment between the Route 18 on and off ramps will be widened and the on-ramp will be lengthened by several hundred feet to provide more room to merge with oncoming traffic. Approximately 2,000 feet of the approach on Interstate I-195 to the bridges will be reconstructed as well. Utilities (including gas, electric, sewer and water, telephone, communication, etc.) and overhead wires will be relocated for construction. The underground Cooper Brook Culvert will also be relocated to accommodate the new highway embankment. To improve the storm-water quality and drainage, a new system with open detention ponds will be constructed in the infield areas. The ponds will detain storm water runoff from the highway and bridges, allow for ground water recharge, and reduce the impacts of stormwater combined with sewer overflows into the Acushnet River. Over the next five years. MassDOT expects to invest over $3 billion repairing the Commonwealth’s Bridges. This includes $816 million already programmed in the STIP using BIL’s reauthorization of existing programs, $1.1 billion under BIL’s new Bridge Formula Program, and $1.25 billion in bonding authority under the Commonwealth’s Next Generation Bridge Program. As of March 25, 2022, further details regarding design and firm construction timelines have not been identified. *Project information, including timeline and contacts, has been obtained through public sources. The content management team continues to pursue additional details; however, the contact(s) listed have yet to disclose or confirm any information. Inquiries should be directed to the contact(s) listed.
Project Abandoned
Bridges / Tunnels
$140,495,213.00
Public - State/Provincial
Demolition, New Construction, Paving, Site Work
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
August 28, 2024
Multiple Locations, New Bedford, MA
Related To This Project
New Bedford, MA
Bid Date: Mar 24 2022
New Bedford, MA
Bid Date: Mar 24 2022
New Bedford, MA
--
New Bedford, MA
Bid Date: Mar 10 2022
New Bedford, MA
Bid Date: Aug 16 2022
New Bedford, MA
--
New Bedford, MA
Bid Date: Mar 30 2023
New Bedford, MA
Bid Date: Apr 01 2021
New Bedford, MA
Bid Date: Mar 31 2022
New Bedford, MA
Bid Date: Mar 31 2022
New Bedford, MA
Bid Date: Jul 15 2020
New Bedford, MA
Bid Date: Sep 04 2020
New Bedford, MA
Bid Date: Oct 26 2021
New Bedford, MA
Bid Date: Mar 10 2022
New Bedford, MA
Bid Date: Mar 10 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.