BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and renovation of a mixed-use development in Eglin, Florida. Completed plans call for the renovation of a military facility; and for site work for a water / sewer project.

Eglin Air Force Base (AFB), FL has a requirement to replace remove and replace the two sets of hangar doors at Hangar 130 on Eglin AFB, FL. The North American Industry Classification System (NAICS) code for this requirement is 236220 Commercial and Institutional Building Construction Contractors with a size standard of $39.5M. Statement of Magnitude is between $5,000,000 and $10,000,000. This is a Small Business Set-Aside competitive acquisition utilizing a best value source selection process and award will be made based upon the Best Value to the Government in accordance with FAR Part 15.3. This project includes, but is not limited to the following, the new hangar doors will be replaced with new structural steel frame, insulated hangar doors rated to 150 mph with impact rated windows. Provide four insulated hollow metal personnel doors with half glass windows, equipped with closers and panic hardware. Install new door openers. Remove and replace hangar door electrical circuits. Replace existing rails and install new rail drainage system that ties into the existing storm water drainage system IAW Unified Facilities Criteria (UFC) 4-211-01. New hangar doors shall match the look of the existing historic doors and windows. The above general description of work does not in any way limit the responsibility of the contractor to perform all work and furnish all labor, materials, and equipment in accordance with the specifications. 8 June 2022 - Formal Release of Amendment 001 The purpose of Amendment 001 is: To clarify email submittals will not be accepted. To change the proposal submittal from the PIEE system to DOD SAFE. As part of this change, a link must be requested NLT than 72 hours prior to the proposal due date of 11 July 2022 at 1200 PM Central (local Eglin time). The deadline to request a DOD SAFE Link or a Base Access Pass is 8 July 2022 NLT 1200 PM Central (local Eglin time). An updated Section L addressing these changes is provided. All changes have been highlighted. 9 June 2022 - Release of Site Visit Sign In Sheet A copy of the Sign In Sheet from the 8 June 2022 Site Visit has been added to the attachments. 15 June 2022 - Formal Release of Amendment 002 The purpose of Amendment 002: Provide updated language in Section L 4.4.1 regarding submission of Past Performance Customer Questionnaires (Attachment L5). CPARS or previously completed Past Performance Customer Questionnaires (Attachment L5) for each project submitted on Attachment L3 (Past Performance Information) are acceptable. Revised language is highlighted for ease of reference. Remove the requirement for bid-bonds, box 13b on the SF 1442. Additionally, RFIs that have been answered to date are being posted (Hangr 130 Doors RFI Form_061522). 21 June 2022 - Replacement of Attachment L1, 50 Divison Cost Estimating Worksheet A blank version of the 50 Division Cost Estimating Worksheet is being provided as an revised Attachment L1.\ 28 June 2022 - Formal Release of Amendment 003 The purpose of Amendment 003: Extend the Proposal Due Date to 25 July 2022 12:00 PM Central Standard (Local Eglin time). 8 July 2022 - RFI UPDATE The RFIs and Amendment will be posted NLT Wednesday, 12 July 2022. The proposal deadline will be adjusted accordingly. 11 July 2022 - Formal Release of Amendment 004 The Purpose of this Amendment is: To officially respond to RFIs. Hangar 130 Doors RFI Form_071122. Post Addendum 001 in response to RFIs, which includes revised drawings. FTFA19-CR36 RepairHangarDoorsBldg130-Addendum001-Summary. The proposal due date will not be adjusted based on answers and Addendum being posted today. 19 July 2022 - Formal Release of Amendment 004 The Purpose of this Amendment is: To extend the proposal submission deadline to 2 August 2022 at 1200 PM Central, local Eglin time. Post Addendum 001 Drawings. 27 July 2022 - Reminder to Request SAFE Links Please remember that SAFE Links must be requested 72-hours prior to the proposal due date. The proposal is due NLT 1200 pm Central on 2 August 2022, and SAFE Links must be requested NLT 1200 pm Central on 30 July 2022, which is a Saturday. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$10,000,000.00

Public - Federal

Renovation, Site Work

Subscribe For Documents

16 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
134
Active Projects
64
Bidding Soon
998
All Active Projects
478
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

August 4, 2022

October 5, 2022

August 30, 2023

img_map_placeholder

To Be Determined, Eglin, FL

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.