EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 30, 2022 at 8:00 PM

Updated October 1, 2024

Site work and paving for a road / highway in Sunbury, Ohio. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The bid shall be accompanied by a Bid Security in the form of a bid bond in the amount of one hundred percent (100%) of the bid or a certified check in the amount of ten percent (10%) of the bid. In addition to the Bid Security, a Performance Bond is required for this project in the amount of one hundred percent (100%) of the total project cost. The Owner requires that all work associated with the project be completed before June 30, 2023. The estimated commencement of work date is April 18, 2022. This is a prevailing wage contract in accordance with Ohio Revised Code Chapter 4115 and the requirements of the Ohio Department of Commerce, Division of Labor and Worker Safety, Wage and Hour Bureau. Bidders shall comply with all applicable provisions. No bids shall be withdrawn for a period of sixty (60) days after the opening thereof. Awarding of the contract shall be to the Lowest and Best bidder as determined by the Delaware County Board of Commissioners in the best interest of Delaware County. The Board reserves the right to reject any or all bids

Award

Roads / Highways

$2,839,284.00

Public - County

Paving, Site Work

219

5

5

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Temporary Facilities and Controls, Temporary Utilities, Temporary Lighting, Execution and Closeout Requirements, Examination and Preparation, Closeout Submittals, Bonds
Division 11 - Equipment

Division 11 - Equipment

Vehicle and Pedestrian Equipment, Parking Control Equipment
Division 26 - Electrical

Division 26 - Electrical

Lighting
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Excavation and Fill, Subgrade Preparation, Excavation, Dewatering, Compaction, Embankments
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Planting, Plants, Shrubs, Trees
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Piece Material Handling Equipment, Cranes and Hoists, Manufacturing Equipment, Manufacturing Lines and Equipment

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
84
Bidding Soon
1,358
All Active Projects
550
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

DEL-CR3642-0.00 Byxbe Parkway, Phase 1A

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.