Demolition, site work and asbestos abatement for a mixed-use development in Fairchild Air Force Base, Washington. Completed plans call for the demolition of a military facility; for site work for a military facility; for asbestos abatement for a military facility; and water / sewer project.

Award Details Contract Award Date: May 25, 2022 Contract Award Number: W5OS9D22P5001 Task/Delivery Order Number: Contractor Awarded Unique Entity ID: CM3FCRKCMR35 Contractor Awarded Name: M. J. Takisaki Inc. Contractor Awarded Address: Seattle, WA 98144-2051 USA Base and All Options Value (Total Contract Value): $175900.00 he purpose of this project is to demolish building 152 and perform site restoration. Demolition services shall remove footings, foundations, concrete pit, and utilities. The building was constructed in 1955 and has exceeded its lifespan. Pre-demolition asbestos materials survey and lead- TCLP testing was performed in 2018. All work shall be performed in accordance with federal, state, local laws and regulations, commercial standards, manufacturer's recommendations, and the Performance Work Statement (PWS). **This project is not fully funded at this time but a Short of Award has been issued. It is EXPECTED to be funded but not guaranteed. PURPOSE The purpose of this project is to demolish building 152 and perform site restoration. Demolition services shall remove footings, foundations, concrete pit, and utilities. The building was constructed in 1955 and has exceeded its lifespan. Pre-demolition asbestos materials survey and lead-TCLP testing was performed in 2018. All work shall be performed in accordance with federal, state, local laws and regulations, commercial standards, manufacturer's recommendations, and this Performance Work Statement (PWS). 1.2 SITE VISIT Interested bidders may attend a site visit prior to the bid due date. Interested offerors are encouraged to include any subject matter experts or sub-contractors required for this work. The site visit will be scheduled and advertised by the Contracting Officer (CO). The contractor shall verify all dimensions, elevations, and site conditions. INITIAL SUBMITTALS 1. Submit the following items no later than the Preconstruction Meeting a. AF 3064 (or equivalent) - Project Schedule b. AF 3065 - Schedule of Values 2. Submit the following items at least ten working days prior to onsite work a. Safety Plan b. Quality Control Plan c. Demolition Plan d. Abatement Plan e. Solid Waste Disposal Plan f. Dust/Debris Control g. Haul/Access Routes Plan h. Notification of Demolition and Renovation Form 3. The Government shall have up to five working days to review submittals B. PRODUCT SUBMITTALS 1. Submit DD Form 1354, Transfer and Acceptance of DoD Real Property 2. The Government shall have up to five working days to review submittals. C. HAZARDOUS MATERIALS 1. Hazardous materials must be approved prior to start of work. 2. Submit one copy of the manufacturer's Safety Data Sheets (SDS) for all hazardous materials used during the course of the project along with the following additional information: a. Number of components in material if it is a kit b. Container type c. Unit of packaging (oz, gal, lb, qt, ea, etc.) d. Package (can, drum, bottle, cylinder, etc.) 1.3 RESPONSE Submit cost proposals to the CO. All responses must be in writing, using the request for proposal (RFP) form specified in the solicitation. All responses must be received by the date and time specified in the solicitation. 1.4 CODES AND REGULATIONS A. All work shall be accomplished in accordance with the following regulatory codes: 1. AHRI Guideline K - Guideline for Containers for Recovered Non-Flammable Fluorocarbon Refrigerants 2. ASSP A10.6 - Safety & Health Program Requirements for Demolition Operations - American National Standard for Construction and Demolition 3. EM 385-1-1 - Safety and Health Requirements Manual 2 1.5 WORKMANSHIP All work shall be accomplished in a professional manner by experienced and qualified tradespersons to the complete satisfaction of the COR. 1.6 APPROVALS AND CHANGES A. Any changes to the terms and conditions of the contract will be issued in writing by the contracting officer prior to commencement of work or incurring costs. B. No deviation from approved plans, specifications and general notes will be permitted without written approval from the COR. Requests for deviations or substitutions must be submitted on a substitution request form available from the COR. C. Any contractor driven change request shall be submitted through a request for information (RFI). 1.7 WARRANTIES All work completed under this contract shall be guaranteed by the contractor against defects in materials or workmanship for a period of one year from date of final project acceptance. 1.8 SUBMITTALS All submittals listed below shall be submitted after award at least ten working days prior to use on site, or as noted below. The method of contractor selection has not been determined at this time. Estimate is at $200k - $500k *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Military

$175,900.00

Public - Federal

Asbestos Abatement, Demolition, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
27
Active Projects
15
Bidding Soon
356
All Active Projects
99
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 25, 2022

May 25, 2022

June 9, 2023

img_map_placeholder

300 N Short Street, Fairchild Air Force Base, WA

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.