Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and new construction of a detention facility in Lancaster, South Carolina. Completed plans call for the construction of a detention facility; and for site work for a detention facility.
The new Lancaster County Detention Center houses both men and women and provides the County upgraded facilities and enhanced ability to serve the mental health needs of inmates. The two story 118,923 SF building on a 13 acre site includes secure perimeters and 313 beds in 205 modular steel cells serving minimum, maximum and mental health pods. The cells are configured with rear chase access in mezzanine arrangements with double stacked cells, day-rooms and exercise yards in each of the eleven housing pods. Each housing pod has an elevated control room using indirect supervision with enhanced security electronic systems throughout the facility to maximize both inmate and officer safety. Additional features include Administration, Officer Training, Locker Rooms, Magistrate Court, Video Visitation, InPerson Visitation, Vehicle Sally Port, Booking, Laundry, Kitchen and Medical areas. Construction Start: July 10, 2024 Substantial Completion: May, 20, 2026 Final Completion: July 31, 2026
Award
Jails / Prisons
$900,000.00
Public - County
New Construction, Site Work
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
5
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2022
July 10, 2024
1941 Pageland Hwy, Lancaster, SC
Related To This Project
Lancaster, SC
Bid Date: May 03 2022
Lancaster, SC
--
Lancaster, SC
Bid Date: May 11 2022
Lancaster, SC
Bid Date: Jul 12 2022
Lancaster, SC
Bid Date: Jun 30 2022
Lancaster, SC
Bid Date: May 12 2020
Lancaster, SC
Bid Date: Jul 28 2022
Lancaster, SC
Bid Date: Aug 02 2022
Lancaster, SC
Bid Date: May 31 2022
Lancaster, SC
Bid Date: Apr 05 2022
Lancaster, SC
Bid Date: May 26 2022
Lancaster, SC
Bid Date: Apr 26 2022
Lancaster, SC
Bid Date: Apr 26 2022
Lancaster, SC
Bid Date: Apr 26 2022
Lancaster, SC
Bid Date: Mar 31 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.