Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 25, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a road / highway in Sanibel, Florida. Completed plans call for site work for a road / highway; and for paving for a road / highway.

This work consists of: various asphalt repairs and striping of shared use paths. Proposals shall be properly and completely executed on a standard proposal form. No bidder may withdraw his proposal within a period of sixty (60) days following the date set for receiving proposals. The City of Sanibel re!serves the right to hold any and all bids for a period of not more than sixty (60) days and said bids shall be and remain valid and in full force and effect during said period. The City of Sanibel reserves the right to reject any and all proposals and to waive informalities. 2022 Shared Use Path Repair Project - The Work consist of various repairs to the Shared Use Path including thermoplastic striping as specified in these contract documents. The above work includes all the construction necessary to give a completed facility. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the Contract.This work consists of: various asphalt repairs and striping of shared use paths. Proposals shall be properly and completely executed on a standard proposal form. No bidder may withdraw his proposal within a period of sixty (60) days following the date set for receiving proposals. The City of Sanibel re!serves the right to hold any and all bids for a period of not more than sixty (60) days and said bids shall be and remain valid and in full force and effect during said period. The City of Sanibel reserves the right to reject any and all proposals and to waive informalities. 2022 Shared Use Path Repair Project - The Work consist of various repairs to the Shared Use Path including thermoplastic striping as specified in these contract documents. The above work includes all the construction necessary to give a completed facility. The Contractor shall furnish all labor, materials, equipment, tools, transportation, and supplies required to complete the work in accordance with the plans, specifications, and terms of the Contract.

Bid Results

Roads / Highways

$298,756.00

Public - City

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
139
Active Projects
58
Bidding Soon
886
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

June 1, 2022

Project location map

Multiple Locations, Sanibel, FL

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed