Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of an educational facility in Sterling, Colorado. Completed plans call for the renovation of a educational facility.
Scope of Work: o Main Gym dimensions are 109 feet x 119 feet or 12,971 square feet o Auxiliary Gym dimensions are 114 feet x 119 feet or 13,566 square feet o Work to start tentatively on July 5th, 2022, (start date is flexible) and completion by July 29, 2022 o Gym floor designs attached to bid posting on VSS. Bank of Colorado Logo will be as shown. The sizes of the lettering, the logos, and the "N" in the middle of gym floor to be determined. o Sand floors down using whatever grits necessary, finishing with a 120 grit sand paper, screening with 100 grit to make the appearance of a glass floor. o Polyurethane Wood Seal to be used is MARC 258 and Full Court Finish PC to be used is MARC 289 o Application of two coats of sealer o Application of two coats of finish o Application of ALL court lines required by NCAA standards using Hillyard gym line paint o Main Gym - Men's and Women's Basketball and Women's Volleyball lines painted per NCAA Standards o Main Gym - North and South under bleachers to include basketball lines painted as well o Auxiliary Gym - Men's and Women's Basketball and Women's Volleyball lines painted per NCAA Standards o Auxiliary Gym - Tennis and Pickle Ball lines painted as well o Option to stain using water pop maple to allow wood to accept the stain evenly, dura seal stain of our choice o Option to stain the perimeter of main gym floor with Northeastern stenciled "N" in center of floor and logos on side o Stencil work with stencil to be laid on floor and paint by number process used, pre-approved design o Polyurethane Wood Seal, dries to a clear transparent film that will not discolor the floor to be applied with lamb's wool applicator o Extremely hard o Excellent penetration o Enhanced appearance o Excellent base for polyurethane gym finish o Drying time 10 to 24 hours o VOC Content 615 grams per liter o 350 to 500 square feet of coverage per gallon o Color clear light yellow o Solvent o Liquid o Oil-modified polyurethane o Gravity .88 o Weight per gallon 7.3 points o Flash point 104 degrees fahrenheit o Non-volatile solids content 30% o Gloss high o Freezability will not freeze o Abrade floor between coats with gym floor conditioning pads o When the sealer is thoroughly dry, apply the paint markings, o When the paint is thoroughly dry, scuff up the paint to promote adhesion to the gym finish o Gym finish to be applied sometime within 24 to 72 hours so the finish coat will bite into the sealer coat fusing all coats together rather than having skin coats one on top of the other o Gym finish to be water-based urethane/acrylic reactive polymers that offer durability and appearance equally to or greater than oil-modified products o One component formula no pot life and no mess o Polycarbonate technology resulting in superior scratch resistance, scuff resistance, durability, depth of gloss and gloss retention o With proper maintenance, finish to last at least a full year o Minimal down time, dry time between coats is one hour under normal conditions, allow 6 to 24 hours before recoating o Suitable for oak, maple and parquet floors o Large area coverage up to 700-900 square feet per gallon o Slip resistant to meet ASTM D2047 o VOC Compliant o Liquid o Odor bland o Color opaque white o Weight per gallon 8.51 pounds o pH 8.0 o Solids content 29% o V.O.C. content 274 grams per liter o Gloss depth high o Finish is not to be applied to bare wood floors, to be used only on previously sealed surfaces o The floor temperature should be a minimum of 50 degrees fahrenheit o If humidity is high above 70% allow at least 12 hours between coats QUESTIONS DUE ON THURSDAY, MARCH 31ST, 2022 BY 4:00 P.M. MDT Q & A'S POSTED ON VSS ON MONDAY, APRIL 4TH, 2022 BY 4:00 P.M. MDT
Post-Bid
Educational
$50,000.00
Public - State/Provincial
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 6, 2022
July 15, 2022
100 College Ave, Sterling, CO
Related To This Project
Sterling, CO
Bid Date: May 16 2022
Sterling, CO
Bid Date: Nov 19 2023
Sterling, CO
Bid Date: May 18 2022
Sterling, CO
Bid Date: May 18 2022
Sterling, CO
Bid Date: Apr 13 2022
Sterling, CO
--
Sterling, CO
Bid Date: Mar 16 2023
Sterling, CO
Bid Date: Apr 29 2022
Sterling, CO
Bid Date: Mar 29 2022
Sterling, CO
Bid Date: Dec 20 2022
Sterling, CO
Bid Date: Nov 18 2022
Sterling, CO
Bid Date: Sep 27 2022
Sterling, CO
Bid Date: Nov 29 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The data you need to build the relationships you want. Try it free.
Sign up now to get free company and project data. No payment required.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.