Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 14, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Eagle Mountain, Utah. Completed plans call for the renovation of a educational facility.

Alpine School District is seeking a contractor to prepare a site including asphalt to install a modular building at Frontier Middle School. The purpose of this RFP is to enter into a contract to provide: Site preparation and modification for the installation of a modular building at Frontier Middle School. It is anticipated that this RFP will result in a single contract award to the responsive and responsible offeror with the highest score justified by the procurement code. All questions must be submitted through SciQuest (U3P) during the Question and Answer period. Pursuant to State of Utah Code 63G-6a-504 bid security requirements, bid security in the amount equal to at least 5% of the bid shall be required for all competitive sealed bidding for construction contracts Length of the Contract The contract resulting from this RFP will be for the duration of this project. Background Frontier Middle School is in need of additional space and as such is adding a modular building to the site. They need construction services related to a 14 classroom modular unit, including utilities, a new asphalt pad, and related site work The Work of Project is defined by the Contract Documents and consists of the following; new asphalt building pad, storm drainage system, new underground utilities including sewer, water, and gas, landscaping, concrete sidewalks, patch and repair of existing site. The building pad and all underground utilities will need to be ready for the modular building to arrive on the date shown below. All other outstanding items are to be completed by the construction completion date shown below. Projected Construction start date: As Soon As Possible Projected Building Pad completion date: May 15, 2022 Projected Construction completion date: June 15, 2022 (actual date of completion will be discussed at pre-bid walkthrough and determined at contract signing

Award

Educational

$80,000.00

Public - State/Provincial

Renovation

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
137
Active Projects
57
Bidding Soon
1,215
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2022

April 27, 2022

Project location map

1427 Mid Valley Rd, Eagle Mountain, UT

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed