BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 27, 2022 at 8:00 PM

Updated September 14, 2023

Site work, paving and renovation of a civil project in Eagle Mountain, Utah. Working plans call for site work for a road / highway; for paving for a road / highway; for the renovation of a water / sewer project; and water / sewer project.

The work, in general, consists of the following: Demolition, saw cutting, asphalt removal, trenching, site piping and wetwell installation, piping, valving, structure modifications, wetwell mixer, piping connections, pipe supports, backfill, pipe enclosure construction, electrical, generator, transfer switch, instrumentation, and appurtenances for a finished project as shown and specified. Questions and requests for clarifications regarding the project must be submitted in writing to Jared@JWOEngineering.com prior to 5:00 pm on July 7, 2022.

Final Planning

Water / Sewer

$600,000.00

Public - City

Paving, Renovation, Site Work

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
144
Active Projects
54
Bidding Soon
1,019
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 19, 2022

August 19, 2022

Project location map

Thunder Gulch Rd, Eagle Mountain, UT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.