BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 19, 2022 at 8:00 PM

Updated October 24, 2023

Site work for a civil project in Olive, New York. Design plans call for site work for a water / sewer project.

Plans call to construct a new wastewater treatment plant that would connect to an existing Boiceville facility, which would be converted to a pump station for the Boiceville Sewer District. As of May 19, 2022, this project is 65% design complete; however, the construction documents completion timeline have not been identified. A tentative bid schedule for contractors have not been determined. Construction is slated to begin Summer of 2023.

Design

Water / Sewer

$40,950,000.00

Public - City

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
522
Active Projects
265
Bidding Soon
3,805
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 28, 2023

Project location map

To Be Determined, Olive, NY


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.