BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Lincolnton, North Carolina. Completed plans call for site work for a playground / park / athletic field.

Award contract to Moss-Marlow in the amount of $799,400.00. This includes the base bid amount of $677,300.00, Alternate 1 amount of $112,000.00, and Contingency of $20,000.00. Lincoln County reserves the right to reject all bids, to waive informalities and technicalities, and to cancel the Bid Process at any time Provide labor, materials equipment and services to complete the Site Furnishings work, as indicated on the drawings, as specified herein or both. B. Including, but not necessarily limited to the following: 1. Shade Structures (3 total 12 x 20 x 10Height) 2. Concrete Benches (4 Total); Owner Provided, Contractor Installed 3. Metal Benches (6 total); Owner Provided, Contractor Installed 4. Outdoor Classroom Benches (4 @ 24 length; 2 @ 12 length; 2 @ 8 length) Note: Quantities shown above are for convenience only. Contractor is responsible for all furnishings shown on the drawings and as specified herein. Owner Provided Equipment: General Contractor is responsible for picking up the Owner Provided Equipment at the County Facilities Operations Center located at 435 Salem Church Road in Lincolnton, NC, deliver the equipment to the site, assemble and install per manufacturers specifications and instructions. E-mail all questions regarding specifications or requirements to Gary Wirth at gwirth@wirthassociates.coms. E-mail clarification of the bid process to John Henry at jhenry@lincolncounty.org. All questions are due by 1700 hrs on Thursday, August 24, 2023 to the persons above. 1.) The work of this contract includes, but is not limited to, demolition/light clearing, grading, erosion control, seeding, storm drainage, asphalt and concrete paving, stamped concrete, concrete seat walls, tensile fabric shade structures, trellis (addalternate #1), landscape planting, and site furnishings. 2.) Contractor shall furnish all material, labor, tools, supplies, equipment, transportation, temporary construction of every nature, insurance, taxes, contributions and all services and facilities, unless specifically excepted, and install all materials, items and equipment required to complete the construction of the Project, as set forth in the Contract. 3.) The General Contractor shall act as the Project Expediter and be responsible for coordinating the work and schedules of other trades.

Award

Playgrounds / Parks / Athletic Fields

$799,400.00

Public - County

Site Work

30

15

9

4

Subscribe For Documents

12 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
116
Active Projects
73
Bidding Soon
1,157
All Active Projects
486
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 31, 2023

October 2, 2023

img_map_placeholder

4797 Westwinds Rd, Lincolnton, NC

The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.