BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 5, 2022 at 8:00 PM

Updated November 14, 2023

Site work and paving for a mixed-use development in Sumter, South Carolina. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

The Project consists of the following major elements: Installation of approximately 1,920 LF of standard 5' wide sidewalk, rough grading, fine grading, detectable warning surfaces, SCDOT crosswalks, storm drainage modifications, sediment and erosion control, grassing, and other miscellaneous and related items. Each Bid must be accompanied by a Bid Bond, prepared on the form of Bid Bond attached to the Contract Documents or a Surety Company's Standard Bid Bond, duly executed by the Bidder as principal and having as surety thereon a surety company licensed to do business in the State of South Carolina. The Bid Bond shall be in the amount of 5 percent of the Bid. Sumter County Ordinance No. 08-675 which allows for local preference in the award of contracts shall apply to this Bid. No Bid will be considered unless the Bidder is legally qualified under the provisions of the South Carolina Contractor's Licensing Law.

Post-Bid

Sidewalks / Parking Lot

$400,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
181
Active Projects
108
Bidding Soon
1,012
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2022

April 29, 2022

Project location map

Loring Mill Rd, Sumter, SC

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.