BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a civil project in Bloomfield Township, Michigan. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.

Install new 16" diameter, ductile iron pipe sanitary sewer and two sanitary manhole structures supported on pipe piles to replace the existing sheet pile-supported sanitary sewer. Approximate length of new sewer is 462 feet, and includes fabrication of cradle support system, continuous by-pass pumping of sanitary sewerage during project, and reconnection of 3 sanitary sewer services. 152 pipe piles, including two test piles, are proposed to be driven to an average depth of 45 feet below the sewer. This project shall include all pavement restoration, surface restoration, traffic control, soil erosion control and other miscellaneous items necessary to complete the work as indicated on the Plans and Specifications. Bidders are advised that to submit a proposal on this project, original documents purchased from Hubbell, Roth, & Clark, Inc. must be used. Proposals submitted by Bidders who have been debarred, suspended, or made ineligible by any Federal Agency will be rejected. All bidders must meet the requirements set forth in the Township's prequalification statement. The Township will require at least three (3) satisfactory municipal references for similar work as a prime contractor over the last five (5) years for all contracts with a value of greater than $500,000.00. The prime contractor or subcontractors to be used on this project must demonstrate experience installing a minimum of 5,000 feet of sanitary sewer by open-cut method. The prime contractor or subcontractors to be used on this project must demonstrate experience installing and operating a bypass pumping system. It is the intention of Bloomfield Township to award this Contract to a qualified contractor with experience on at least one (1) pile-supported sewer or water main project. General Requirements - Bid Deposit Required - Insurance Required Bid Bond 5 % - Installation Required

Award

Roads / Highways

$2,599,599.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
87
Bidding Soon
1,392
All Active Projects
578
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 5, 2022

May 5, 2022

img_map_placeholder

Pine Tree Trail & W Long Lake Rd, Bloomfield Township, MI

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.