EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 26, 2022 at 8:00 PM

Updated October 1, 2024

Site work for a playground / park / athletic field in Homer Glen, Illinois. Completed plans call for site work for a playground / park / athletic field.

**As of April 26, 2022, this project has not yet been awarded. A timeline for award has not yet been established. RFP questions due to Parks & Facilities Superintendent John Robinson jrobinson@homerglenil.org on April 1, 2022. All questions regarding the Request for Proposals should be directed in writing to John Robinson, Parks and Facilities Superintendent, at jrobinson@homerglenil.org. Questions will be accepted until April 1, 2022 at 4:30 p.m. The project consists of the design, procurement and installation of an all-inclusive playground system including fall zone material at Heritage Park / Active Core. Work is to include the design of a play system, as well as the installation of commercial grade playground equipment, equipment footings, drainage materials, fall zone material and perimeter edging. All equipment will be assembled and installed by the proposer. The Park must serve all ages listed in Appendix A and should comply with the Americans with Disabilities Act and Illinois Disability Guidelines. The Park must have appropriate signage, walkways, ramps, and access points to enable efficient movement and use of the Park. The playground and the Equipment and Materials therein must comply with the National Recreation and Parks Playground Safety Inspection guidelines. The Villages total budget for the Park, including all Equipment, Materials, construction, and installation is $225,000, and the Villages expectation is that all of the construction work will be complete by August 31, 2022. Construction schedule may change with approval of the Village. The project consists of the design, procurement and installation of an all-inclusive playground system including fall zone material at Heritage Park / Active Core. Work is to include the design of a play system, as well as the installation of commercial grade playground equipment, equipment footings, drainage materials, fall zone material and perimeter edging. All equipment will be assembled and installed by the proposer.

Post-Bid

Playgrounds / Parks / Athletic Fields

$225,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Quality Requirements, Regulatory Requirements
Division 11 - Equipment

Division 11 - Equipment

Entertainment Equipment, Play Field Equipment and Structures, Playground Equipment
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
280
Active Projects
162
Bidding Soon
2,107
All Active Projects
1,063
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2022

August 15, 2022

img_map_placeholder

14240 W 151st St, Homer Glen, IL

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

RFP D/B - To Design, Procure and Install All - Inclusive Playground Equipment at Heritage Park Active Core

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.