BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2022 at 8:00 PM

Updated February 15, 2024

Site work and paving for a road / highway in Oak Grove, Minnesota. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Feasibility Study for Street Improvements on 198th Ave NW, 199th Ave NW, and Orchid St. NW Location: One ninety-ninth (199th) Ave NW east terminus is Lake George Blvd NW (CSAH 9) and its west terminus is a cul-de-sac just west of 199th Ave NW's intersection with Poppy St. NW. 199th Ave NW is approximately 1,300 feet in length. One ninety-eighth (198th) Ave NW east terminus is CSAH 9 and extends approximately 700 feet to its west terminus, which is Orchid St. NW. The section of Orchid St. NW that is proposed to be paved has a southern terminus with one ninety-seventh (197th) Ave NW and extends approximately 1,300 feet to its northern terminus with 199th Ave NW. Then general location of these streets is depicted in Exhibit 1. Existing Conditions: 198th Ave NW, 199th Ave NW, and Orchid Street consist of a gravel surface mixed with the underlying sand sub-base. Although it is difficult to determine the existing structural equivalence of intermixed sand and gravel, it is estimated that there is 2 to 4 inches of class 5 gravel. By comparing roadway alignments from aerial photography with plats of the city map, it appears that most of the roads are located in the approximate center of the right-of-way. Paving the 199th Ave NW cul-de-sac will require the acquisition of additional right-of-way or easements if a standard City cul-de-sac is constructed. Currently, no portion of the existing gravel turnaround is located within the right-of-way. A majority of the existing gravel turnaround is located on the property with parcel identification number (PIN) 43-002. An aerial photograph along with overlying plat in relation to the roadways is depicted in Exhibit 2. There are no documented culverts on the sections of road that are to be paved. Start Construction May 2022 Substantial and Final Completion August 2022

Bid Results

Roads / Highways

$514,409.00

Public - City

Paving, Site Work

4

3

2

3

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
251
Active Projects
128
Bidding Soon
1,470
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2022

May 11, 2022

Project location map

Multiple Locations, Oak Grove, MN

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.