Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 16, 2022 at 8:00 PM
Updated October 1, 2024
Renovation of an educational facility in Toccoa, Georgia. Completed plans call for the renovation of a educational facility.
- Remove and dispose of existing boiler and associated equipment. Include all incidental connections (electric, fuel, water, steam, and etc...) - Supply and Install Boiler - Skid Mounted Vertical Compact Tubeless Steam Boiler (Modular Package) - 25BHP, operating pressure is approx 105psi, Natural Gas Fired. The package is to include feed water, preheat, pump, blow down separator, water softener, and chemical feed system. Include all incidental connections (electric, fuel, water, steam, and etc...) - Chem Aqua (Drew.Ellis@chemaqua.com) is the districts vendor of choice for chemical management services. Please coordinate with Chem Aqua to ensure that all necessary connections are provided for their installation. Please include any associated costs in your proposal. - Supply and install new exhaust stack/chimney (exhaust is through the roof) - Supply and install two(2) pilot controlled steam regulating stations. o Valve 1 will supply the canning line (5 retorts, 2 water bath) and will be regulated to 15psi o Valve 2 will supply the jacket kettle line (6 kettles) and will be regulated to 35psi - Supply and install new steam line traps, as required. - Supply and install new equipment steam traps for all equipment/devices - Supply and install new relief valves for all equipment/devices - Supply and install 4 new blend stations at the existing wash down stations - Supply and Install materials, as required, for any/all required steam line modifications, changes, and/or reconfiguring. - Supply and Install return lines from the existing equipment to the boiler. - Supply and Install PVC Wrapped Pipe Insulation for all distribution and return steam lines. - The contractor is responsible for a turnkey installation and is to include any/all incidental items, labor, and/or equipment, as required to deliver a fully functional compliant product. - Provide ala carte pricing for labor and materials for the connection of new equipment, should the owner choose to replace any of these units. (ie... Retort, Continuous Exhauster, Blanching Table, Jacketed Kettles) - The contractor is responsible for all final cleanup and disposal. - All Contractor supplied materials must comply with ASME, and satisfy code standards requirements - Provide Startup, Operational, Shutdown, and Compliance (record keeping) Training
Post-Bid
Educational
$300,000.00
Public - County
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
May 2, 2022
June 1, 2022
207 School Circle, Toccoa, GA
Related To This Project
Toccoa, GA
Bid Date: Apr 01 2022
Toccoa, GA
Bid Date: Apr 18 2022
Toccoa, GA
Bid Date: Jul 21 2022
Toccoa, GA
Bid Date: Jul 21 2022
Toccoa, GA
Bid Date: Jul 21 2022
Toccoa, GA
Bid Date: Jul 28 2022
Toccoa, GA
Bid Date: Jul 01 2022
Toccoa, GA
Bid Date: Feb 25 2021
Toccoa, GA
Bid Date: Apr 14 2022
Toccoa, GA
--
Toccoa, GA
Bid Date: Nov 03 2023
Toccoa, GA
Bid Date: Feb 23 2024
Toccoa, GA
Bid Date: Oct 04 2022
Nashville, GA
Bid Date: Apr 26 2022
Tifton, GA
Bid Date: Apr 26 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.