EN

BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 8, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a municipal facility in Vail, Colorado. Working plans call for the construction of a municipal facility; for site work for a municipal facility; and 152-space municipal facility.

As of June 8, 2022, this project has been bid. The bids came in too high and rebid information has yet to be announced. Two addenda have been posted for this solicitation as of 5/18/22, however due to the prequalification process, bidders must contact the owner to receive all documents and addenda for this project. Addendum 1 and 2 are posted for reference only. As of 5/11/2022, this project has been issued for bid to pre-qualified contractors selected during the qualification phase. For more details, please contact the owner. Question Acceptance Deadline 04/01/2022 02:00 PM EDT Questions are submitted online No Buyer's Requirements General Requirements - Insurance Required Bonding Requirements - Bid Bond 5 % Qualified General Contractors are invited to bid on a new 5,600 square-foot Rest Area Building, a new 614 SF Forest Service building, a new freshwater treatment system, a new viewing deck, and site reconstruction located at the top of Vail Pass at MP190 along Interstate-70. Along with three new parking lots, totaling 152 parking spaces. The Rest Area Building will be two-stories with an attached maintenance garage. The building is a concrete masonry unit (CMU) structure with a cross gabled style metal shingled roof with glue-laminated structural timbers. The 3,200 square-foot main level of the rest area building will have restrooms, janitorial and vending machine space, covered viewing decks, aluminum store fronts, and interpretive displays incorporated into many of the building's architectural elements. The 1,275 square-foot basement will have water treatment equipment, water storage, mechanical, electrical, plumbing, and information technology equipment. The 1,340 square-foot maintenance garage will have an office, breakroom, maintenance storage space and stairs to the basement. The Rest Area building will tie into an onsite wastewater treatment plant that has recently been upgraded.

Final Planning

Municipal

$11,400,000.00

Public - State/Provincial

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
35
Bidding Soon
497
All Active Projects
214
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.