BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published August 23, 2022 at 8:00 PM

Updated September 14, 2023

Site work and paving for a civil project in Mirabel, Quebec. Design plans call for site work for a water / sewer project; road / highway; and for paving for a road / highway.

Upgrades and improvement to the City water supply system. The scope of the project includes the work to increase the capacity of the Cyr pumping station and construction of a 1,000 meter long delivery pipeline in the Saint-Janvier area. TIMELINE: The owner has awarded an engineering professional consultant to complete the project design and construction work monitoring. Preliminary studies and conceptual planning are underway. Preliminary plans are expected to begin in fall 2022. Schedules for further project development are being finalized.

Design

Water / Sewer

$5,000,000.00

Public - City

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
479
Active Projects
215
Bidding Soon
3,228
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 15, 2023

Project location map

Multiple Locations, Mirabel, QC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.