Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published June 13, 2022 at 8:00 PM

Updated September 14, 2023

Site work and new construction of a municipal facility in Hot Springs National Park, Arkansas. Working plans call for the construction of a municipal facility; and for site work for a municipal facility.

As of June 13, 2022, bids received were rejected as they were over the budget. Project will rebid but no definite date yet. The following is a general scope of work to provide materials and labor for the construction project of two metal building structures to be used as work areas and offices for the City of Hot Springs, Public Works Department, Traffic Division: A. Office Building/Workshop B. Shop/Open Bays Building The construction consists of pre-engineered metal building systems with metal stud/gwb partitions. Ceilings in the office areas are 2' x 2' suspended acoustical. Floor system in the office areas are wood framed with plywood floor decking, covered with LVT. Other floors are exposed concrete slab. Perform work of the contract under a stipulated sum contract with the City in accordance with the conditions of contract. Work of the Project includes the construction of two metal building structures for work areas and offices for the City of Hot Springs Public Works Department 1. Office Building/ Workshop contains approximately 1,163 sq.ft. of heated and cooled area, 2,920 sq.ft. of heated work shop, and 1,125 sq.ft. of covered parking and porch 2. Work Bays Building contains approximately 985 sq.ft. of enclosed, ventilated workshop area and 1,855 sq.ft. of covered slab. B. The construction consists of pre-engineered metal building systems with metal stud/gwb partitions. Ceilings in the office areas are 2'x2' suspended acoustical. Floor system in the office areas are wood framed with plywood floor decking, covered with LVT. Other floors are exposed concrete slab. C. Perform Work of the Contract under a stipulated sum contract with the Owner in accordance with the Conditions of Contract

Final Planning

Municipal

$962,220.00

Public - City

New Construction, Site Work

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
114
Active Projects
48
Bidding Soon
547
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 25, 2022

December 14, 2022

Project location map

To Be Determined, Hot Springs National Park, AR

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed