Site work for a water / sewer project in Milwaukee, Wisconsin. Completed plans call for site work for a water / sewer project.
100 LEAD SERVICE LINE REPLACEMENTS, by qualified City of Milwaukee licensed and bonded contractors. Qualified bidders shall have the necessary equipment and experience to replace lead service lines using trenchless methods including, but not limited to, the following (Pulling, Hole Hogging, Boring, Directional Drilling, and Pipe Bursting). Service line replacement locations may include properties along upcoming paving projects, childcare facilities, or emergency locations where a leak or failure has occurred. Each location will require either the full replacement of the water service line from the municipal water main up to the interior water meter setting, or, at locations where a portion of the service line was previously replaced with copper, the replacement of the remaining lead portion of the service line. When the existing water meter setting is not code compliant, work will also include a new meter setting. Work may include, but is not limited to, the procurement of all necessary permits, a site visit prior to work beginning, scheduling the installation with the property owner, traffic control, erosion control, saw-cutting, excavation, installation of a new copper service line utilizing trenchless technology (MWW approval is required for open cut installation), tapping of the water main, abandonment of the lead service line, installation of an updated water meter setting up to and including the outlet valve, reconnection to the interior building piping, code-compliant restoration of the electrical ground wire, backfilling of the excavation(s), restoration of pavement, curb and gutter, and walk, and final cleanup of the work site. Temporary and permanent restoration requirements will be at the discretion of MWW. The contractor will be requested to provide a second crew under this contract if the required emergency replacements exceed the capacity of one crew. Locations will be at various sites throughout the City of Milwaukee. All work shall be in compliance with the City of Milwaukee Rules and Regulations Governing Water Service, the City of Milwaukee Water Service Piping Specifications, and the City of Milwaukee Special Provisions for Lead Service Line Replacement. Prices from all bidders will be kept on file. If the successful bidder fails to fulfill the contract requirements, an agreement with a secondary contractor may be pursued for work at specific emergency locations. : 100 project working days. The contractor shall begin scheduling work immediately following contract execution. For service line replacements along upcoming paving projects, the contractor must complete at least two full service replacements per working day. All work, including site restoration, must be completed by August 5, 2022. The contractor will be required to mobilize to the designated location within 48 hours of notification and substantially complete the replacement within three City business days of notification. Substantial completion is considered restoration of water service to the property with a copper water service and backfilling all excavations. A maximum of one project working day is allowed for substantial completion at each site. Permanent restoration of pavement, curb and gutter, and walk will not be included in project working days if completed within two weeks (weather permitting) of substantial completion. MWW reserves the right to require site restoration immediately following the service installation if deemed necessary for traffic, safety, or public welfare. MWW reserves the right to assess daily contract per diem charges on projects which exceed allowable project working days. If a secondary contractor is utilized to perform work at a project site, MWW reserves the right to assess the cost difference in addition to the per diem.
Award
Water / Sewer
$718,518.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 14, 2022
June 14, 2022
Multiple Locations, Milwaukee, WI
Related To This Project
Milwaukee, WI
--
Milwaukee, WI
Bid Date: May 06 2022
Milwaukee, WI
Bid Date: Mar 09 2022
Milwaukee, WI
Bid Date: May 09 2022
Milwaukee, WI
Bid Date: Feb 11 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 20 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 22 2022
Milwaukee, WI
--
Milwaukee, WI
Bid Date: Apr 21 2022
Milwaukee, WI
Bid Date: Apr 26 2022
Milwaukee, WI
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.