Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Published May 18, 2022 at 8:00 PM
Updated October 24, 2023
Site work and paving for a mixed-use development in Duluth, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.
The Board of Regents of the University of Minnesota (the "University") is requesting Bids to provide construction services for Chester Park roadway and sidewalk improvement on the Duluth campus (the "Project"). The scope of the Project includes the repaving of approximately 560' of campus roadway on W. Clover St. along with adjacent sidewalks, installation of curb/gutter, and storm drains as required. TKDA is the Architect/Engineer of Record for the Project. Refer to the attached RFP Documents for full Project details. The selected Respondent will perform the Work for a Contract Sum that shall be a fixed, lump sum that shall include all costs necessary to complete the Work in accordance with the Contract Documents, including Respondent's overhead and profit. The University requires the Project to be substantially complete by no later than July 29, 2022. All other prevailing wage violations and questions should be sent to: Department of Labor and Industry Prevailing Wage Section 443 Lafayette Road N St Paul, MN 55155 (651) 284-5091 DLI.PrevWage@state.mn.us The Contractor, before commencing the Work, shall furnish a Performance Bond and a Labor and Material Payment Bond (individually, a "Bond," collectively, the "Bonds") to the Owner. The Performance Bond shall be in an amount equal to 100% of the full amount of the Contract Sum as security for the faithful performance of the Contract Documents, and the Labor and Material Payment Bond shall be in an amount equal to 100% of the full amount of the Contract Sum as security for the payment of all persons performing labor and furnishing materials in connection with the Contract Documents. Such Bonds shall be on forms approved by the Owner and shall name the Owner as a primary obligee. The Owner shall have the right to reject Work that does not conform to the Contract Documents and to require inspection and testing of the Work to the same extent as the Architect's authority Question Cutoff Date 4/13/2022 01:00:00 PM (ET)
Award
Sidewalks / Parking Lot
$328,570.00
Public - State/Provincial
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 20, 2022
May 16, 2022
1303 Ordean Ct, Duluth, MN
Related To This Project
Duluth, MN
Bid Date: Apr 19 2022
Duluth, MN
Bid Date: Apr 28 2022
Duluth, MN
Bid Date: Apr 28 2022
Duluth, MN
Bid Date: May 10 2022
Duluth, MN
Bid Date: Jun 06 2019
Duluth, MN
--
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Bid Smarter, Not Harder
Spend more time doing the job than looking for it. ConstructConnect has the industry's most complete project data to help you find, bid, and win. Now.
Sign up to get free access, instantly.
