EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work, paving and outdoor lighting for a mixed-use development in Cottage Grove, Wisconsin. Completed plans call for site work for a road / highway; for outdoor lighting for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

Curbs, Excavation, Concrete Pavement Removal, Asphalt Overlay, Rehab. and/or Maint., Pavement - Marking, Pedestrian Improvements, Trails and/or Multipurpose Trails, Utility Street Construction and Excavation, Street/Road Asphalt Milling, Street/Road Widening, Traffic Control, Pavement Removal, Stormwater Improvements, Paving (Asphalt or Concrete) The Project includes the following Work: 500 linear feet of RCP storm sewer; 3,900 square yards of asphalt pavement milling; 7,000 square yards of asphalt pavement pulverization; 11,300 tons of dense graded base; 3,000 linear feet of concrete curb and gutter, 3,800 tons of asphalt pavement (including a roadway and a multi-use path); as well as pavement markings, signage, a rapid rectangular flashing beacon (RRFB), and lighting. The roadway will be kept open to traffic throughout construction and includes a staged traffic control plan. The Village of Cottage Grove reserves the right to reject any or all Bids, to waive any technicality, and to accept any Bid which it deems advantageous. All Bids shall remain subject to acceptance for 85 days after the time set for receiving Bids. Contract award shall be made based on the lowest responsive and responsible Bidder. Funding is provided in part by the Dane County PARC and Ride Grant. The Strand Associates, Inc.(R) project manager is Tyler Wallin, P.E., and can be contacted at Strand Associates, Inc.(R), 910 West Wingra Drive, Madison, WI 53715, (608) 251 4843, regarding the Project. For further requirements regarding Bid submittal, qualifications, procedures, and Contract Award, refer to the Instructions to Bidders that are included in the Bidding Documents. *Information regarding subcontractor bidding has not been disclosed to the content management team at this time. Interested subcontractors should contact the general contractor directly for more information.

Award

Roads / Highways

$1,275,481.00

Public - City

Outdoor Lighting, Paving, Site Work

Subscribe For Documents

22 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
143
Active Projects
62
Bidding Soon
1,131
All Active Projects
407
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2022

May 30, 2022

img_map_placeholder

N Main St, Cottage Grove, WI

Related To This Project


New Year, New Possibilities. Make the connections you need to kickstart 2025.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.