BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 28, 2022 at 8:00 PM

Updated September 14, 2023

Renovation of an educational facility in Las Vegas, Nevada. Working plans call for the renovation of a educational facility.

The owner has selected a Construction Manager. DOCUMENT 00 11 13 CLARK COUNTY SCHOOL DISTRICT CONTRACT PROCUREMENT AND COMPLIANCE SERVICES CONSTRUCTION MANAGER AT RISK SERVICES PUBLIC WORKS PROJECT INVITATION FOR CONSTRUCTION MANAGER AT RISK. The Clark County School District, Contract Procurement and Compliance Services Dept., is soliciting Request for Proposals from firms for Construction Manager at Risk (CMAR) services for: Bonanza High School Comprehensive Renovation 6665 West Del Rey Las Vegas, Nevada 89146 Clark County School District MPID #0014823 Pre-Construction and Construction services for a Comprehensive Renovation Project at the Bonanza High School. The work will include upgrades to all low voltage system, new electrical service, lighting upgrade, various site improvements, and architectural/finishes throughout the existing school. The budget for construction cost for each project is $45,395,000.00 SUBMITTAL DEADLINE FOR REQUEST FOR QUALIFICATIONS: The CMAR will provide the required pre-construction and construction services. Preconstruction services shall include assisting the design team with constructability matters, construction cost, value engineering, fast track options and scheduling. The construction services shall include determining a Guaranteed Maximum Price (GMP), procurement of all subcontractor contracts, and managing construction of the project. Selection Criteria and weighted values: General pass/fail, Applicant organization, workload and past performance (20%), Designated Project Manager and Superintendent experience on CMAR and Design Build with similar size and scope (20%), Project Management Plan (30%), Subcontractors and Safety Program (25%), Certificate of Eligibility for preference (5%). The estimated CMAR Phases will be Preconstruction Phase Services, June 21, 2022 December 30, 2022 and Construction Services, April 3, 2023 June 30, 2024. The Clark County School District invites all businesses, which includes women-owned, minority-owned, and disadvantaged business enterprise companies to participate. The Clark County School District is an equal opportunity employer and will not knowingly discriminate in any area of employment.

Final Planning

Educational

$45,395,000.00

Public - County

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
58
Active Projects
18
Bidding Soon
427
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 13, 2022

December 13, 2022

Project location map

6665 Del Rey Ave, Las Vegas, NV

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.