Published August 3, 2022 at 8:00 PM

Updated October 1, 2024

Site work and new construction of a fire / police facility in Noble, Oklahoma. Completed plans call for the construction of a fire / police facility; and for site work for a fire / police facility.

Bidders may obtain a maximum of two (2) sets of Drawings and Specifications by deposit and additional sets by paying printing costs ($3.00/sheet for Drawings - $0.15/page for Specifications). Deposits will be refunded to Bidders who submit a bona fide Bid at the time and place designated herein and who return the Bidding Documents to the Architect in good condition within ten (10) days from the bid date. The full and complete replacement cost of missing, damaged or unreturned Bidding Documents will be deducted from the Bidders deposit. The full replacement cost for complete sets of Bidding Documents will be deducted from the deposits of Bidders who do not submit a bona fide Bid and do not return the Bidding Documents to the office of the Architect in good condition within five (5) days from the date they received them or no later than seven (7) days prior to bid date. Bidding Documents shall be returned to the Architect's Office postage paid. The Architect will not accept delivery of Bidding Documents returned C.O.D., freight collect or other similar methods. Subcontractors and Suppliers may obtain full or partial sets of Bidding Requirements and Documents directly from the Architect by paying the printing costs specified above. All Bidding Requirements and Documents remain property of the Architect. The Bidding Documents are on file at the Architect's office and are available and open for inspection by Bidders and Sub bidders by appointment during normal business hours. In submitting a bid it is agreed that the Bid may not be withdrawn for a period of thirty (30) days after Bid Date. A Bid Security in the form of a cashier's check, or certified check, or acceptable bidder's surety bond, made payable to the Owner, in an amount that is not less than five percent (5%) of the Bid proposal submitted, including all Alternates, shall accompany each Bid as a guarantee that: (1) the Bidder will not modify, withdraw or cancel the proposal for thirty (30) days after the bid date; and (2) the bidder, if awarded the contract, will promptly enter into a contract and execute such bonds and furnish such insurance certificates as may be required. Should the Bidder fail to honor these two (2) guarantee for any reason, the Owner shall total his damages and shall deduct the amount of such damages from the Bidder's Bid Security. Should the damages total less than the amount of the Bid Security, the difference shall be returned to the Bidder. However, all damages in excess of the Bid Security shall be borne by the Owner. Damages may include, but shall not be limited to, reasonable compensation for the Owner's additional time spent, additional Architect's fees, costs to the Owner for delays in completion of the Work based upon the Bidders proposed Contract Time and the Contract Time as Awarded including, but not limited to, interest expense and lost revenue, the difference between the Bidder's proposed Contract Sum and the Contract Sum as awarded and costs to re bid the Project should such action become necessary. Such bid securities will be returned to the unsuccessful bidders after execution of the Contract. For information concerning any part of the proposed work, contact the Architect: Prairie Rock Architecture PLLC (PRA), P.O. Box 2618, Blanchard, OK 73010. Telephone (405) 255-8202. Additional bidding instructions are included in the Bidding Requirements bound into the Contract Documents. The Owner reserves the right to reject any or all bids and waive formalities and irregularities.

Award

Fire / Police

$2,515,000.00

Public - City

New Construction, Site Work

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Contract Modification Procedures, Quality Requirements, Regulatory Requirements, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cutting and Patching, Cleaning and Waste Management, Closeout Procedures, Closeout Submittals, Warranties, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 02 - Existing Conditions

Division 02 - Existing Conditions

Demolition
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Concrete Curing
Division 04 - Masonry

Division 04 - Masonry

Unit Masonry, Clay Unit Masonry, Concrete Unit Masonry, Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Cold-Formed Metal Framing
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Finish Carpentry, Millwork
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Thermal Protection, Roofing and Siding Panels
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Windows, Hardware, Door Hardware, Glazing, Glass Glazing, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Supports for Plaster and Gypsum Board, Suspension Systems, Tiling, Ceilings, Acoustical Ceilings, Flooring, Resilient Flooring, Acoustic Treatment, Acoustic Wall Coating, Painting and Coating
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Visual Display Surfaces, Signage, Interior Specialties, Partitions, Toilet, Bath, and Laundry Accessories, Toilet Accessories, Storage Specialties, Lockers, Exterior Specialties, Protective Covers
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Escalators and Moving Walks, Scaffolding
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings, Air Outlets and Inlets
Division 26 - Electrical

Division 26 - Electrical

Lighting, Emergency Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Earthwork Methods, Soil Treatment, Termite Control, Special Foundations and Load-Bearing Elements, Special Foundations
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Operation and Maintenance of Utilities

Find More Local Projects

Within 75 Miles of This Project
74
Active Projects
43
Bidding Soon
543
All Active Projects
226
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 10, 2022

August 9, 2022

img_map_placeholder

115 Maple St, Noble, OK

Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Rebid Fire Station #1

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.