Published May 4, 2022 at 8:00 PM

Updated January 26, 2024

Site work and renovation of a water / sewer project in Shingletown, California. Completed plans call for the renovation of a water / sewer project; and for site work for a water / sewer project.

The Project consists of constructing a new pump station, site piping, 236,000-gallon welded steel storage tank, 5,000-gallon hydropneumatic tank, emergency generator and SCADA improvements, and demolition of an existing 33,000 gallon in ground reservoir and pump station. Questions concerning these documents should be directed to Tom Warnock, twarnock@paceengineering.us, or Steve Wilson, swilson@paceengineering.us, at PACE Engineering, Inc., 530-244-0202. This project is funded in part by the State Revolving Fund (SRF), and as such a labor compliance program (LCP) in accordance with California Labor Compliance Code Section 1771.8 must be adopted and enforced. Additionally, SRF requires payment of federal prevailing wages, specifically, Davis-Bacon Act wage rules apply to all assistance agreements made in whole or in part with SRF funds. Additionally, projects funded with monies made available by SRF have statutory requirements commonly known as American Iron and Steel (AIS) requirements, which require all of the iron and steel products used in the project to be produced in the United States, including iron and steel products provided by the Contactor pursuant to this Agreement. Manufacturers and/or models listed herein may or may not provide materials meeting AIS requirements. If listed manufacturers cannot provide AIS materials, it is still incumbent upon the Contractor to meet AIS requirements at no additional cost to the Owner. No Bid will be accepted from a Contractor who does not hold a Class A license in accordance with the provisions of Section 3300 of the California Public Contract Code. No Contractor or Subcontractor may be listed on a Bid proposal for a public works project unless registered with the Department of Industrial Relations pursuant to Labor Code Section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code Section 1771.1(a)]. Bidders are notified that financing for this project is provided pursuant to SRF Program and the Division of Financial Assistance, and that as allowed in Public Contract Code Section 22300, this Contract does provide for substitution of securities for any monies withheld by the Owner to ensure performance under this contract. Bidders are further notified that this Contract does permit retainage to be placed in escrow and/or to be invested for the benefit of the Contractor. SRF funding for this project includes strict guidelines for Disadvantaged Business Enterprises (DBE). Good Faith Efforts (GFE) are required for all financial agreement Recipients and Bidders to ensure that all DBEs have the opportunity to compete for procurements funded by financial assistance dollars. Make information on forthcoming opportunities available to DBEs. The Recipients and Bidders shall post at least once in a local newspaper with the largest circulation for the area. Bidders shall use the services and assistance of the Small Business Administration (SBA) and Minority Business Development Agency (MBDA) of the Department of Commerce. If the prime contractor awards subcontracts, the prime contractor is required to take the above steps. Owner reserves the right to accept or reject any and/or all Bids and to make that award which is in the best interest of the Owner.

Post-Bid

Water / Sewer

$2,500,000.00

Public - City

Renovation, Site Work

60

43

7

5

Subscribe For Documents

43 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, References, Reference Standards, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Erection, Cleaning and Waste Management, Closeout Submittals, Maintenance Data, Bonds, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Concrete Forming and Accessories, Concrete Forming, Structural Cast-in-Place Concrete Forming, Concrete Reinforcing, Precast Concrete, Precast Structural Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 05 - Metals

Division 05 - Metals

Structural Metal Framing, Structural Steel Framing, Metal Fabrications
Division 06 - Wood, Plastics, and Composites

Division 06 - Wood, Plastics, and Composites

Rough Carpentry, Finish Carpentry
Division 07 - Thermal and Moisture Protection

Division 07 - Thermal and Moisture Protection

Dampproofing and Waterproofing
Division 08 - Openings

Division 08 - Openings

Doors and Frames, Metal Doors and Frames, Plastic Doors, Hardware, Door Hardware, Louvers and Vents
Division 09 - Finishes

Division 09 - Finishes

Plaster and Gypsum Board, Gypsum Board, Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Interior Specialties, Partitions
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping, Hangers and Supports for Plumbing Piping and Equipment, Plumbing Piping and Pumps, Facility Water Distribution, Domestic Water Piping, Domestic Water Pumps, Plumbing Equipment, Domestic Water Filtration Equipment, Plumbing Fixtures
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Hangers and Supports for HVAC Piping and Equipment, HVAC Piping and Pumps, Hydronic Piping and Pumps, Hydronic Pumps, HVAC Air Distribution, HVAC Ducts and Casings, Metal Ducts, Air Duct Accessories, Dampers, Air Outlets and Inlets, Central HVAC Equipment, Decentralized HVAC Equipment, Decentralized Unitary HVAC Equipment
Division 26 - Electrical

Division 26 - Electrical

Electrical, Common Work Results for Electrical, Hangers and Supports for Electrical Systems, Low-Voltage Electrical Distribution, Low-Voltage Switchgear, Facility Electrical Power Generating and Storing Equipment, Packaged Generator Assemblies, Lighting, Interior Lighting, Exterior Lighting
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security, Electronic Detection and Alarm, Fuel-Gas Detection and Alarm
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Fill, Backfill, Compaction, Erosion and Sedimentation Controls
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Flexible Paving, Asphalt Paving, Curbs and Gutters, Site Improvements, Fences and Gates, Planting, Plants, Shrubs, Trees
Division 33 - Utilities

Division 33 - Utilities

Water Utilities, Water Utility Distribution Piping, Water Utility Storage Tanks, Electrical Utilities, Utility Substations
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 35 - Waterways and Marine Construction

Division 35 - Waterways and Marine Construction

Waterway and Marine Construction and Equipment, Coastal Construction, Shoreline Protection
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Mobile Plant Equipment, General Vehicles, Bicycles
Division 44 - Pollution Control Equipment

Division 44 - Pollution Control Equipment

Water Treatment Equipment

Find More Local Projects

Within 75 Miles of This Project
6
Active Projects
2
Bidding Soon
72
All Active Projects
40
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 5, 2022

July 4, 2022

img_map_placeholder

Constellation Dr, Shingletown, CA


Find. Bid. Win. Your Next Project Starts Here.

Get Access Now

Get the right
data with Project Intelligence

Share with your network.

Storage Capacity Improvements Project

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.