BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Nashville, Tennessee. Working plans call for site work for a road / highway; and for paving for a road / highway.

https://www.tn.gov/tdot/news/2022/9/16/construction-of-new-donelson-pike-interchange-prompts-traffic-shift.html Construction of New Donelson Pike Interchange Prompts Traffic Shift NASHVILLE, Tenn. - As work on the new I-40/Donelson Pike interchange begins, crews will be implementing a long-term traffic shift in both east and westbound lanes of I-40 this weekend. Only one lane of traffic will remain open while the traffic shift takes place Friday, September 16, from 8 p.m. to 10 a.m. and again on Saturday, September 17, from 8 p.m. to 10 a.m. It will stretch from mile marker 216.7 to mile marker 217.5 in both directions. Once traffic has been shifted, the road will return to four lanes of travel. In addition, the ramp from I-40 East to Terminal Drive will be closed, and the ramp from Briley Parkway South to I-40 East will be down to one lane on Saturday. The project involves the relocation of the interchange and the existing state route, primarily providing access to expanded BNA facilities. The newly constructed exit will be a diverging diamond interchange (DDI). The unique crisscross design of a DDI allows two directions of traffic to temporarily cross to opposite sides of the roadway in order to travel across the overpass, and then cross back and resume the original travel pattern. The project is expected to be completed in the summer of 2027. Visit the project web page for more information. From your desktop or mobile device, get the latest construction activity and live streaming SmartWay traffic cameras at www.TNSmartWay.com/Traffic. Travelers can also dial 511 from phone for travel information. As always, drivers are reminded to use all motorist information tools wisely and Know Before You Go! by checking travel conditions before leaving for your destination. Drivers should never tweet, text or talk on a cell phone while behind the wheel. ______________________ TNDOT - I-40/Donelson Pike Interchange

Final Planning

Roads / Highways

$5,000,000.00

Public - State/Provincial

Paving, Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
43
Active Projects
28
Bidding Soon
719
All Active Projects
306
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.